# The India Data Centre Playbook

Provider: India Energy Atlas
Course: https://www.energymap.in/dc-course
Version: 2026.11

The syllabus is public. Lessons and laboratory exercises require a Clerk account. Module 11’s full manuscript is restricted to the private cohort.

Learning formats: Interactive mathematical models, Diagram construction, Circuit simulation, Virtual data hall, Readings, Guided equipment tours, Unproctored assessment.

Mira provides offline coaching for the Module 6 outage and circuit trace.

Lecture recordings are not yet included; interactive explanations and written companions are available.

## 1. Unit economics

https://www.energymap.in/dc-course/lessons/1

- Separate capacity revenue from metered energy.
- Explain fixed-cost recovery as occupancy changes.

Practice: Price a powered bay.
Model: Capacity revenue and fixed-cost recovery.
Assumptions: Illustrative tariff, occupancy and captured constant energy cost; no market forecast.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 2. Site selection

https://www.energymap.in/dc-course/lessons/2

- Identify common-mode route failures.
- Build a jurisdiction-aware approval register covering fire and life safety.

Practice: Screen a site.
Model: Power headroom and physical route diversity.
Assumptions: A map is screening evidence; utility commitments, surveys and approvals need separate verification.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 3. Grid connection

https://www.energymap.in/dc-course/lessons/3

- Relate facility kW, power factor and connection kVA.
- Identify the utility and electrical-inspection evidence needed for connection.

Practice: Reserve connection capacity.
Model: Real power, apparent power and rectifier waveforms.
Assumptions: The power triangle assumes sinusoidal steady state. The separate diode bridge has no active power-factor correction.
Optional Volt Lab: Diode bridge: DC load resistance and pulsed AC current.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 4. Electrical topology

https://www.energymap.in/dc-course/lessons/4

- Evaluate UPS capacity after one module loss.
- Review isolation boundaries, protection dependencies and maintenance evidence.

Practice: Survive a module loss.
Model: Post-failure UPS capacity and a 48 V to 12 V buck converter.
Assumptions: N+1 capacity does not establish independent paths. The open-loop converter has no soft start or hardware protection model.
Optional Volt Lab: Buck converter: load current, output voltage and startup peak.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 5. Cooling systems

https://www.energymap.in/dc-course/lessons/5

- Relate flow, heat transport and temperature rise.
- Compare air, water and liquid cooling, and test fire–HVAC interfaces.

Practice: Choose a heat sink.
Model: Heat transport, thermal delay and energy–water trade-offs.
Assumptions: Lumped teaching model, not computational fluid dynamics. Fixed PUE and WUE values are scenario assumptions.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 6. Backup power

https://www.energymap.in/dc-course/lessons/6

- Explain battery terminal-voltage change from a solved Volt Lab trace.
- Complete a utility outage, qualified diesel transfer and controlled restoration.
- Distinguish VRLA and lithium-ion hazards and emergency responsibilities.

Practice: Keep the hall online.
Model: Battery terminal voltage, inverter switching and utility outage.
Assumptions: Hypothetical battery model, not a manufacturer VRLA discharge curve. Battery-trace time and plant time are separate.
Optional Volt Lab: H-bridge: inductance and current continuity across voltage reversals.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 7. Power procurement

https://www.energymap.in/dc-course/lessons/7

- Compare contracts at one delivered-cost boundary.
- Explain how contract mix changes cost.

Practice: Blend two power contracts.
Model: Delivered energy cost and contract weighting.
Assumptions: Synthetic prices; real eligibility, charges and settlement require current project evidence.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 8. Carbon matching

https://www.energymap.in/dc-course/lessons/8

- Match supply and demand by time block.
- Distinguish surplus energy from energy matched to load.

Practice: Match supply by time block.
Model: Time-block clean-energy matching.
Assumptions: Two equal time blocks, no storage dispatch or attribute banking; not a carbon certification.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 9. Data hall operations

https://www.energymap.in/dc-course/lessons/9

- Reconcile facility and IT energy over one interval.
- Evaluate integrated fire-system tests and a documented operational handover.

Practice: Reconcile meter boundaries.
Model: Power, energy, thermal and service boundaries.
Assumptions: Interval PUE uses aligned energy totals. A snapshot power ratio is labelled separately.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 10. Grid flexibility

https://www.energymap.in/dc-course/lessons/10

- Bound a flexibility bid by service-compatible workload.
- Identify duration, rebound and operational constraints.

Practice: Offer a dispatch block.
Model: Deferrable load, duration and recovery obligation.
Assumptions: Capacity arithmetic does not establish ramp, rebound or market qualification.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## 11. Monetization

https://www.energymap.in/dc-course/lessons/11

- Match commercial commitments to power and cooling-ready capacity.
- Identify the limiting physical constraint in a compute allocation.

Practice: Allocate the compute floor.
Model: Contract allocation within cooling-ready capacity.
Assumptions: Public capacity exercise only; full manuscript remains restricted to the private cohort.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Private cohort manuscript; experiment available to signed-in learners.

## 12. Capital and exit

https://www.energymap.in/dc-course/lessons/12

- Distinguish enterprise value from equity proceeds.
- Stress-test income, capitalization rate, debt and exit costs.

Practice: Underwrite the exit.
Model: Income capitalization and net equity proceeds.
Assumptions: Hypothetical sensitivity; check stated debt and exit costs for each example.
Lecture: Six read-aloud scenes with worked examples and lab demonstrations; recording pending.
Reading: Signed-in learners.

## Professional learning records

Completion and active learning-time records support professional-development documentation. Acceptance as PDH or continuing education is determined by the relevant licensing body or employer. No external accreditation is claimed.

## Model limits

Educational models with explicit assumptions, not installation instructions, a protection study, a code-compliance approval or a professional licence.

## Sources

- [DOE/FEMP data center design guide, July 2024](https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf)
- [Volt Lab circuit solver, pinned source revision a1d7997](https://github.com/sayonsom/volt-lab/tree/a1d799771e00b3979333a70bf7ea0594ea75b454)
- [BIS National Building Code](https://www.bis.gov.in/standards/national-building-code/?lang=en)
- [CEA electrical safety regulations](https://cea.nic.in/cei-regulations/?lang=en)
- [NFPA 75](https://www.nfpa.org/codes-and-standards/7/5/nfpa-75)
- [NFPA 855](https://www.nfpa.org/codes-and-standards/nfpa-standard-development/855)
- [NCEES continuing professional competency records](https://ncees.org/ncees-services/cpc-tracking)

Reviewed: 2026-11-08