{"name":"The India Data Centre Playbook","version":"2026.11","provider":{"name":"India Energy Atlas","url":"https://www.energymap.in"},"url":"https://www.energymap.in/dc-course","language":"en","prerequisites":["Basic algebra","Power and energy units; core terms are defined in the lesson scripts"],"machineReadable":{"curriculum":"https://www.energymap.in/dc-course/curriculum.json","syllabus":"https://www.energymap.in/dc-course/course.md"},"audience":["Electrical engineers","Mechanical engineers","Data center operators","Engineering students","Infrastructure professionals"],"access":"The syllabus is public. Lessons and laboratory exercises require a Clerk account. Module 11’s full manuscript is restricted to the private cohort.","learningMode":["Interactive mathematical models","Diagram construction","Circuit simulation","Virtual data hall","Readings","Guided equipment tours","Unproctored assessment"],"tutor":"Mira provides offline coaching for the Module 6 outage and circuit trace.","recordedLectures":"Lecture recordings are not yet included; interactive explanations and written companions are available.","professionalLearning":"Completion and active learning-time records support professional-development documentation. Acceptance as PDH or continuing education is determined by the relevant licensing body or employer. No external accreditation is claimed.","credential":{"name":"Certified by India Energy Atlas","type":"Course completion","requirements":"All 68 learner-reported practice checkpoints and a server-graded unproctored final assessment: at least 80% overall and every safety decision correct.","hours":"Actual recorded active lesson time; no fixed approved PDH allocation.","recordUrl":"https://www.energymap.in/dc-course/record"},"modelScope":"Educational models with explicit assumptions, not installation instructions, a protection study, a code-compliance approval or a professional licence.","lessons":[{"number":1,"title":"Unit economics","exercise":"Price a powered bay","url":"https://www.energymap.in/dc-course/lessons/1","outcomes":["Separate capacity revenue from metered energy.","Explain fixed-cost recovery as occupancy changes."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Capacity revenue and fixed-cost recovery","assumptions":"Illustrative tariff, occupancy and captured constant energy cost; no market forecast.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":2,"title":"Site selection","exercise":"Screen a site","url":"https://www.energymap.in/dc-course/lessons/2","outcomes":["Identify common-mode route failures.","Build a jurisdiction-aware approval register covering fire and life safety."],"activities":["concepts","experiment","sizing","hall","safety","debrief"],"model":"Power headroom and physical route diversity","assumptions":"A map is screening evidence; utility commitments, surveys and approvals need separate verification.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":3,"title":"Grid connection","exercise":"Reserve connection capacity","url":"https://www.energymap.in/dc-course/lessons/3","outcomes":["Relate facility kW, power factor and connection kVA.","Identify the utility and electrical-inspection evidence needed for connection."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Real power, apparent power and rectifier waveforms","assumptions":"The power triangle assumes sinusoidal steady state. The separate diode bridge has no active power-factor correction.","optionalWaveformLab":"Diode bridge: DC load resistance and pulsed AC current","lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":4,"title":"Electrical topology","exercise":"Survive a module loss","url":"https://www.energymap.in/dc-course/lessons/4","outcomes":["Evaluate UPS capacity after one module loss.","Review isolation boundaries, protection dependencies and maintenance evidence."],"activities":["concepts","experiment","sizing","hall","safety","debrief"],"model":"Post-failure UPS capacity and a 48 V to 12 V buck converter","assumptions":"N+1 capacity does not establish independent paths. The open-loop converter has no soft start or hardware protection model.","optionalWaveformLab":"Buck converter: load current, output voltage and startup peak","lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":5,"title":"Cooling systems","exercise":"Choose a heat sink","url":"https://www.energymap.in/dc-course/lessons/5","outcomes":["Relate flow, heat transport and temperature rise.","Compare air, water and liquid cooling, and test fire–HVAC interfaces."],"activities":["concepts","experiment","sizing","heat","hall","safety","debrief"],"model":"Heat transport, thermal delay and energy–water trade-offs","assumptions":"Lumped teaching model, not computational fluid dynamics. Fixed PUE and WUE values are scenario assumptions.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":6,"title":"Backup power","exercise":"Keep the hall online","url":"https://www.energymap.in/dc-course/lessons/6","outcomes":["Explain battery terminal-voltage change from a solved Volt Lab trace.","Complete a utility outage, qualified diesel transfer and controlled restoration.","Distinguish VRLA and lithium-ion hazards and emergency responsibilities."],"activities":["concepts","predict","circuit","heat","sizing","hall","safety","debrief"],"model":"Battery terminal voltage, inverter switching and utility outage","assumptions":"Hypothetical battery model, not a manufacturer VRLA discharge curve. Battery-trace time and plant time are separate.","optionalWaveformLab":"H-bridge: inductance and current continuity across voltage reversals","lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":7,"title":"Power procurement","exercise":"Blend two power contracts","url":"https://www.energymap.in/dc-course/lessons/7","outcomes":["Compare contracts at one delivered-cost boundary.","Explain how contract mix changes cost."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Delivered energy cost and contract weighting","assumptions":"Synthetic prices; real eligibility, charges and settlement require current project evidence.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":8,"title":"Carbon matching","exercise":"Match supply by time block","url":"https://www.energymap.in/dc-course/lessons/8","outcomes":["Match supply and demand by time block.","Distinguish surplus energy from energy matched to load."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Time-block clean-energy matching","assumptions":"Two equal time blocks, no storage dispatch or attribute banking; not a carbon certification.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":9,"title":"Data hall operations","exercise":"Reconcile meter boundaries","url":"https://www.energymap.in/dc-course/lessons/9","outcomes":["Reconcile facility and IT energy over one interval.","Evaluate integrated fire-system tests and a documented operational handover."],"activities":["concepts","experiment","sizing","hall","safety","debrief"],"model":"Power, energy, thermal and service boundaries","assumptions":"Interval PUE uses aligned energy totals. A snapshot power ratio is labelled separately.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":10,"title":"Grid flexibility","exercise":"Offer a dispatch block","url":"https://www.energymap.in/dc-course/lessons/10","outcomes":["Bound a flexibility bid by service-compatible workload.","Identify duration, rebound and operational constraints."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Deferrable load, duration and recovery obligation","assumptions":"Capacity arithmetic does not establish ramp, rebound or market qualification.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"},{"number":11,"title":"Monetization","exercise":"Allocate the compute floor","url":"https://www.energymap.in/dc-course/lessons/11","outcomes":["Match commercial commitments to power and cooling-ready capacity.","Identify the limiting physical constraint in a compute allocation."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Contract allocation within cooling-ready capacity","assumptions":"Public capacity exercise only; full manuscript remains restricted to the private cohort.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Private cohort manuscript; experiment available to signed-in learners"},{"number":12,"title":"Capital and exit","exercise":"Underwrite the exit","url":"https://www.energymap.in/dc-course/lessons/12","outcomes":["Distinguish enterprise value from equity proceeds.","Stress-test income, capitalization rate, debt and exit costs."],"activities":["concepts","experiment","sizing","hall","debrief"],"model":"Income capitalization and net equity proceeds","assumptions":"Hypothetical sensitivity; check stated debt and exit costs for each example.","optionalWaveformLab":null,"lectureScript":"Six read-aloud scenes with worked examples and lab demonstrations; recording pending","readingAccess":"Signed-in learners"}],"sources":[{"name":"DOE/FEMP data center design guide, July 2024","url":"https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf"},{"name":"Volt Lab circuit solver, pinned source revision a1d7997","url":"https://github.com/sayonsom/volt-lab/tree/a1d799771e00b3979333a70bf7ea0594ea75b454"},{"name":"BIS National Building Code","url":"https://www.bis.gov.in/standards/national-building-code/?lang=en"},{"name":"CEA electrical safety regulations","url":"https://cea.nic.in/cei-regulations/?lang=en"},{"name":"NFPA 75","url":"https://www.nfpa.org/codes-and-standards/7/5/nfpa-75"},{"name":"NFPA 855","url":"https://www.nfpa.org/codes-and-standards/nfpa-standard-development/855"},{"name":"NCEES continuing professional competency records","url":"https://ncees.org/ncees-services/cpc-tracking"}],"reviewedAt":"2026-11-08"}