Verdict · FAIL — the page serves 0 MW for every load/peak tile (current, today, two-year, all-time) and shows no installed-capacity figure; load + generation are effectively unpopulated for this isolated UT grid, while the authoritative CEA capacity (129.28 MW) and peak (~69.8 MW) are both well-attested.

Andaman & Nicobar Islands — Verification Report (May 2026)

Page verified: /states/andaman-nicobar · Retrieved: "2026-05-30". Tolerance: ±5% / ±2pp.

Anchor comparison

# Metric energymap displays Authoritative source (value · retrieved) Δ Within tolerance?
1 Peak demand (all-time, headline) 0 MW (all-time/POSOCO peak tile, dated "2026-05-29") ~69.8 MW · May 2024 record (up from 58.4 MW Jul 2023; ~69 MW as of 2025) · CEIC · 2026-05-30 −100% ❌
1a Peak demand (two-year tile) 0 MW (dated "2026-05-29") ~69.8 MW (same window) −100% ❌ (see IEA-1198)
1b Latest daily peak 0 MW (dated "2026-05-30") Isolated SLDC feed — not wired — ❌ (telemetry absent)
2 Installed capacity (physical, in-state) not shown (no capacity figure rendered) 129.28 MW · CEA Utilities, as on 31.08.2025 — cea.nic.in · 2026-05-30 n/a (page blank) ❌ (page side)
3 Capacity by fuel empty / not shown CEA 31.08.2025: Diesel 92.71 MW + RES (MNRE) 36.57 MW = 129.28 MW (Hydro 0, Coal 0, Gas 0, Nuclear 0) — ❌ (page side)
4 AT&C losses "AT&C loss history is not yet published" PFC — not separately verified — ⚠️ unverified (honestly marked N/A on page)
5 RPO compliance "No published RPO targets … wired up for this state yet" JERC (UT) — not separately verified — ⚠️ unverified (honestly marked N/A on page)
6 Residential tariff ₹2.70/kWh + ₹21.50 fixed/mo (JERC, eff. "28 October 2025") JERC tariff order — consistent with displayed value; not independently re-fetched — ✅ (plausible)
7 Imports / interchange "↓13 MW from Eastern (projected)" Isolated island grid — no physical synchronous tie to Eastern Region; this is a modelled/placeholder value — ⚠️ implausible for an islanded UT

Findings

  • Peak demand — headline delta is −100%, and it is real, not a misread. The all-time peak tile, the two-year peak tile, the latest-daily-peak tile, and current demand all render 0 MW; the page even surfaces "Loading state… / warming up" copy. I re-fetched the page twice to rule out a fetch artifact — the served value is genuinely 0 MW, so there is no large positive over-display to correct here. The authoritative record peak is ~69.8 MW (May 2024), having risen from 58.4 MW (Jul 2023) and sitting near 69 MW through 2025 (CEIC). Headline delta (page all-time 0 vs authoritative ~69.8) = −100%. This is a data-pipeline gap: the load telemetry feed for this isolated UT grid is not wired up.
  • Two-year peak tile reads 0 (IEA-1198 territory, but more severe). IEA-1198 is the systemic understatement of the two-year-peak tile. Here the tile is not merely low — it is zero — so A&N is a degenerate case of that bug (no peak data at all rather than an undercounted peak). Reference IEA-1198; no new ticket.
  • Installed capacity — authoritative figure IS verifiable; the page is what's blank. Contrary to the assumption that islands are excluded from CEA's mainland tables, Andaman & Nicobar does appear in the CEA "All India Installed Capacity (Utilities)" report (as on 31.08.2025), with a Sub-Total Grand Total of 129.28 MW (Diesel 92.71 MW + RES/MNRE 36.57 MW; arithmetic checks: State 62.77 + Private 61.51 + Central 5.00 = 129.28). I confirmed the row belongs to Andaman & Nicobar (the label sits between the Private and Central rows, and the diesel/RES sub-components reconcile to 129.28). So CEA physical capacity = 129.28 MW is verified, not "−100%" and not "islands reported separately/unverified." The failure is on the page side: it renders no capacity figure and an empty fuel array.
  • Basis note (IEA-1199). A&N's CEA number here is the physical in-state basis (sum of diesel + RES plants located in the territory). There is no allocation-wise mainland share to reconcile against for an islanded UT — the only meaningful capacity basis is physical, and it equals 129.28 MW. No physical-vs-allocated gap applies (IEA-1199), so this is not a basis discrepancy; it is simply absent page data versus a present, verified authoritative value.
  • Imports "↓13 MW from Eastern" is implausible. A&N is an isolated island grid with no synchronous interconnection to the Eastern Region; a 13 MW import projection is a modelled/placeholder artifact and should not be shown as real interchange. Flagged as a separate display concern (no new ticket filed here).
  • Honestly-marked N/A anchors. AT&C losses and RPO compliance are explicitly flagged "not published / not wired up" rather than fabricated — acceptable, marked unverified. Residential tariff (₹2.70/kWh + ₹21.50 fixed, JERC eff. "28 October 2025") is present and plausible; not independently re-fetched from a JERC PDF, so left ✅ with a caveat.

Verdict rationale

FAIL. Two core same-basis anchors fail on the page side: peak demand renders 0 MW against an authoritative ~69.8 MW record (−100%), and installed capacity renders no value against a verified CEA physical figure of 129.28 MW. These are genuine data-population gaps (load telemetry + plant inventory not wired for this UT), not basis differences (IEA-1199 does not apply) and not unverifiable anchors — both authoritative values are well-attested. The two-year-peak zero is the IEA-1198 pattern in its most degenerate form. Unverified anchors (AT&C, RPO) are honestly disclosed on the page and do not by themselves drive the verdict.

Methodology

Live values read from the Andaman & Nicobar Islands page on "2026-05-30" (page re-fetched to confirm the 0 MW peak tiles are served, not a fetch artifact). Authoritative peak from CEIC (~69.8 MW, May 2024) cross-checked against multi-year trend (58.4 MW Jul 2023 → ~69 MW 2025). CEA capacity read from the "All India Installed Capacity (Utilities)" report as on 31.08.2025 (/tmp/cea_ic.txt): A&N Sub-Total Grand Total = 129.28 MW, with diesel/RES sub-components reconciled to confirm the row identity. No value interpolated. Where the page honestly declares data unavailable, the anchor is marked unverified rather than failed on fabrication grounds.


Part of the F40 per-state cross-verification programme (IEA-1070).

Sources

  • CEA "All India Installed Capacity (Utilities)" report, as on 31.08.2025 — https://cea.nic.in/installed-capacity-report/
  • CEIC — Andaman & Nicobar peak surplus/deficit — https://www.ceicdata.com/en/india/electricity-demand-and-supply/electricity-power-andaman-and-nicobar-islands-peak-surplus-or-deficit
  • MoP "24x7 Power for All — Andaman & Nicobar Islands" — https://powermin.gov.in/sites/default/files/uploads/joint_initiative_of_govt_of_india_and_andman_nicobar.pdf
  • JERC tariff order (eff. "28 October 2025"), as displayed on energymap.in