Verification·Andhra Pradesh·Retrieved 2026-05-30·IEA-1077

Andhra Pradesh — Data Verification vs CEA / SLDC / SR-LDC

Verdict · PASS — Headline all-time peak (page 15,016 MW vs authoritative 15,016 MW) reconciles exactly (Δ 0.0%). Installed capacity gap (page 31,844.2 MW physical-in-state vs CEA 28,387.08 MW allocated) is a basis difference (IEA-1199), not an error. The two-year-peak tile understates (12,526.6 vs 15,016 MW) — systemic IEA-1198, already captured by the page's separate all-time field. Regulatory anchors 4–7 unverified (no fabrication).

Andhra Pradesh — Verification Report (May 2026)

Page verified: /states/andhra-pradesh · Retrieved: 2026-05-30. Tolerance: ±5% / ±2pp.

Peak-demand fields (read precisely)

The page exposes four distinct demand values; they are NOT interchangeable:

Field Page value · date Meaning
Current/live demand 10,880 MW · 2026-05-30 06:00 IST Instantaneous draw
Today's peak 12,527 MW · 2026-05-30 Highest so far today
Two-year peak (tile) 12,526.6 MW · 2026-05-29 Rolling 2-yr max — understates (see IEA-1198)
All-time peak (field) 15,016 MW · 2026-05-21 Record day peak — headline anchor

The headline peak verdict compares the page's all-time peak field against AP's authoritative record.

Anchor comparison

# Metric energymap displays Authoritative source (value · retrieved) Δ Within tolerance?
1 Peak demand (all-time field — HEADLINE) 15,016 MW (date "2026-05-21") 15,016 MW · thehansindia · 2026-05-30 0.0% ✅
1b Peak demand (two-year-peak tile) 12,526.6 MW (date "2026-05-29") 15,016 MW · same · 2026-05-30 −16.6% ⚠️ systemic (IEA-1198)
2 Installed capacity (total) 31,844.2 MW (physical in-state) CEA Aug-2025 allocation-wise: 28,387.08 MW (allocated share) +12.2% ⚠️ basis differs (IEA-1199)
3 Capacity by fuel Coal 13,890 · RE 12,888.03 · Hydro 3,290 · Gas 1,739.4 · Diesel 36.8 MW (in-state plants) CEA Aug-2025 allocated: Coal 12,730.83 · Lignite 180.23 · Gas 1,300.70 · Diesel 36.80 · Nuclear 127.27 · Hydro 3,113.60 · RES 10,897.65 MW — ⚠️ basis differs (IEA-1199)
4 AT&C losses 11.4% (APSPDCL, FY23) PFC — ⚠️ unverified
5 RPO compliance 18.0% (FY23, modeled) APERC — ⚠️ unverified
6 Residential tariff ₹1.90/kWh (0–30 kWh slab) APERC tariff order — ⚠️ unverified
7 Interchange / RT demand Latest daily peak 11,003 MW (2026-05-30) SR-LDC PSP / AP SLDC — ⚠️ unverified

Findings

  • Headline peak reconciles exactly (✅, Δ 0.0%): The page's all-time-peak field shows 15,016 MW dated 2026-05-21, matching AP's authoritative record day peak of 15,016 MW set on 21 May 2026 (APTransco/SLDC, alongside an all-time energy consumption of 288.9 MU and an evening peak of 12,474 MW). Confirmed across two independent reports (The Hans India; PingTV). This is the headline anchor and it passes cleanly.
  • Two-year-peak tile understates by 16.6% (⚠️ systemic, not a new bug): The rolling two-year tile reads 12,526.6 MW (2026-05-29) — below the true record of 15,016 MW. This is the known systemic two-year-peak understatement mapped to IEA-1198; it warrants no new fix-ticket. The correct record is already carried by the page's separate all-time field (row 1), so the page is not missing the number — only the two-year tile derives a lower one. (Note: the first-pass draft mislabeled this tile as 12,527 MW, which is actually "today's peak"; the tile value is 12,526.6 MW.)
  • Installed capacity +12.2% — physical-vs-allocated basis, not an error (⚠️ IEA-1199): The page shows 31,844.2 MW = sum of power-plant capacity physically located in AP (coal 13,890 + RE 12,888.03 + hydro 3,290 + gas 1,739.4 + diesel 36.8, from /infra-counts). CEA's allocation-wise table reports AP's allocated share of 28,387.08 MW (Andhra Pradesh Sub-Total row, Grand Total column, As-on 31.08.2025). These are two different bases: a physically-in-state total reasonably runs higher than the allocation-wise figure because some in-state central/shared generation is allocated to other states. Per methodology this is the physical-vs-allocated basis issue (IEA-1199), not a tolerance failure. (AP is mainland and present in the allocation-wise table — verified the Sub-Total row directly precedes the Telangana block.)
  • Regulatory anchors 4–7 unverified: AT&C losses, RPO compliance, residential tariff and real-time interchange could not be cross-referenced against a primary regulator/PFC/SR-LDC source within this run. Marked unverified rather than guessed (hard no-fabrication rule).

Methodology

Live values read from the Andhra Pradesh page on 2026-05-30 (current demand, today's peak, two-year-peak tile, all-time-peak field). Installed capacity and fuel split read from /api/states/andhra-pradesh/infra-counts (the endpoint returned HTTP 500 via WebFetch but resolved cleanly via curl). Authoritative peak quoted with source + retrieval date. CEA capacity from the Aug-2025 allocation-wise report (/tmp/cea_ic.txt extract; Andhra Pradesh Sub-Total row → Grand Total column = 28,387.08 MW), with the row confirmed to belong to AP (state-name line 198, Sub-Total line 200, immediately above the Telangana block). No value interpolated.

Verdict

PASS. The headline all-time peak reconciles exactly (Δ 0.0%); the installed-capacity and fuel-split gaps are basis differences (physical-in-state vs CEA-allocated, IEA-1199), not data errors; and the two-year-peak tile understatement is the already-tracked systemic bug (IEA-1198) that the page's own all-time field compensates for. Anchors 4–7 remain explicitly unverified (not failures). No same-basis number is wrong beyond tolerance.


Part of the F40 per-state cross-verification programme (IEA-1070).

Sources

  • CEA Installed Capacity Report (Aug-2025, allocation-wise) — https://cea.nic.in/wp-content/uploads/installed/2025/08/IC_Aug_2025allocation_wise-1.pdf
  • The Hans India (AP record day peak 15,016 MW, 21 May 2026, APTransco/SLDC) — https://www.thehansindia.com/andhra-pradesh/ap-powers-through-record-summer-demand-1078502
  • PingTV (AP grid crosses 15,000 MW, May 2026) — https://pingtvindia.com/ap-power-grid-records-historic-high-power-demand-crosses-15000-mw-amid-intense-heatwave/
  • energymap /infra-counts API — https://api.energymap.in/api/states/andhra-pradesh/infra-counts