Bihar — Data Verification vs CEA / SLDC / ER-LDC
Verdict · PARTIAL — All-time peak tile reconciles to the verified record (+0.05%); installed capacity +29.8% is a physical-vs-allocated basis difference (IEA-1199), not an error; two-year-peak tile understates the record by ~40% (systemic IEA-1198); several DISCOM/tariff anchors left unverified this pass.
Bihar — Verification Report (May 2026)
Page verified: /states/bihar · Retrieved: 2026-05-30. Tolerance: ±5% / ±2pp.
Distinguishing the peak-demand fields
The Bihar page exposes four distinct demand tiles, which must not be conflated:
| Tile | Value (page) | Label/date on page |
|---|---|---|
| Current/live demand | 4,801 MW | live |
| Today's peak | 5,306 MW | "10:00 IST" |
| Two-year peak | 5,306 MW | "2026-05-29" |
| All-time peak (record) | 8,822 MW | "2026-05-24" |
The all-time peak tile is the headline anchor and it reconciles to the verified record. The two-year peak tile is the one that misbehaves (it has collapsed to the same value as today's peak).
Anchor comparison
| # | Metric | energymap displays | Authoritative source (value · retrieved) | Δ | Within tolerance? |
|---|---|---|---|---|---|
| 1 | All-time peak (HEADLINE) | 8,822 MW @ "2026-05-24" | 8,818 MW · Deshaj Times (new May-2026 record) · 2026-05-30 — supersedes prior record 8,560–8,597 MW (12 Jul 2025, CEA via CEIC) | +0.05% | ✅ |
| 1b | Two-year peak tile | 5,306 MW @ "2026-05-29" | ~8,818 MW record · Deshaj Times · 2026-05-30 | −39.8% | ❌ (systemic IEA-1198) |
| 2 | Installed capacity (total) | 10,821.3 MW (physical in-state) | 8,339.08 MW · CEA Aug-2025 allocation-wise — cea.nic.in · 2026-05-30 | +29.8% | ⚠️ basis difference (IEA-1199), not an error |
| 3 | Capacity by fuel | Coal 10,170.0 MW; Renewable 651.26 MW | CEA Aug-2025 allocation-wise (Bihar): Coal 7,644.15; Hydro 72.88; RES 622.06; Nuclear 0.00 | — | ⚠️ basis difference |
| 4 | AT&C losses | 30.3% (SBPDCL, "FY23") | PFC Report on Performance of DISCOMs | — | ⚠️ unverified |
| 5 | RPO compliance | 10.4% ("FY23", modeled) | BERC RPO compliance order | — | ⚠️ unverified |
| 6 | Residential tariff | Rs 7.42/kWh (0–50) · Rs 7.96/kWh (>50) | BERC tariff order | — | ⚠️ unverified |
| 7 | Interchange / RT demand | Imports 5,293 MW (ER); live demand 4,801 MW | ER-LDC PSP / SLDC | — | ⚠️ unverified |
Findings
-
All-time peak tile is correct (+0.05%) — this is the headline PASS. The page's 8,822 MW (2026-05-24) matches the independently reported new May-2026 record of 8,818 MW (Deshaj Times; corroborated by Patna Press). That record broke Bihar's prior high of 8,560 MW recorded 12 July 2025 (≈8,597 MW per CEA via CEIC). Against the prior CEA record the delta is +2.6% — also within tolerance — so the headline passes on both the current and the prior record basis. No "large positive misread" here; the figure is real.
-
Two-year peak tile understates the record by ~40% — systemic, not fresh. The two-year tile shows 5,306 MW (identical to today's peak), against a record of ~8,818 MW: a −39.8% understatement. This is the known systemic two-year-window understatement bug and maps to IEA-1198 — no new ticket. It is the single substantive display defect on this page.
-
Installed capacity +29.8% is a basis difference, not a data error — reference IEA-1199. The page shows capacity physically located in Bihar (full-station nameplate of central-sector thermal plants sited in the state — NTPC Barh / Kahalgaon / Barauni, etc.), totalling 10,821.3 MW. CEA's Aug-2025 allocation-wise table credits Bihar only its allocated share of those central/joint stations, giving a Bihar Sub-Total GrandTotal of 8,339.08 MW (Central 6,944.15 coal + 72.88 hydro = 7,017.02; State 70.70; Private 1,251.36). The two figures use different bases — physical-in-state vs allocated-share — so the +29.8% gap is the expected physical-vs-allocated basis issue, not a tolerance failure. Bihar's CEA nuclear allocation is 0.00 MW, consistent with the page's 0.0% nuclear. Recommend disclosing the capacity basis on the page.
- Row identity confirmed: the CEA
Biharblock (Aug-2025 allocation-wise, Eastern Region) reads — State 70.70, Private 1,251.36, Central 7,017.02, Sub-Total 8,339.08 — and the adjacent Jharkhand block begins immediately after, so the Sub-Total row genuinely belongs to Bihar (layout verified, not a name-misalignment artefact).
- Row identity confirmed: the CEA
-
Unverifiable this pass (honestly flagged, no values fabricated): AT&C losses (30.3%, FY23), RPO (10.4%, FY23 modeled), residential tariff (Rs 7.42 / Rs 7.96), and ER interchange were displayed but not independently cross-checked against PFC / BERC / ER-LDC primary sources within this run — left unverified. The fuel-mix tile (Thermal 99.9%) is a live real-time generation snapshot, not a capacity mix, so it is not comparable to CEA capacity shares and is excluded from the capacity reconciliation.
Methodology
Live tile values read from the Bihar page on 2026-05-30; authoritative values quoted with source + retrieval date. The all-time peak record (8,818 MW) is corroborated by two independent news sources plus the prior-record CEA/CEIC series. CEA capacity via the Aug-2025 allocation-wise report — Bihar Sub-Total GrandTotal = 8,339.08 MW (row identity verified against the surrounding Eastern-Region block). Capacity is reported on both bases (physical-in-state vs CEA-allocated); the gap is explained, not scored as a failure. No value interpolated or fabricated.
Part of the F40 per-state cross-verification programme (IEA-1070).
Sources
- CEA Installed Capacity (Aug-2025, allocation-wise) — https://cea.nic.in/wp-content/uploads/installed/2025/08/IC_Aug_2025allocation_wise-1.pdf
- CEIC / CEA — Bihar Peak Demand — https://www.ceicdata.com/en/india/electricity-demand-and-supply/power-peak-demand-eastern-bihar
- Deshaj Times — Bihar power demand record 8,818 MW (May 2026) — https://deshajtimes.com/news/bihar/patna/bihar-mein-bijli-ki-mangat-record-par-pahunchi/276001/
- Patna Press — Bihar power consumption record — https://patnapress.com/bihar-breaks-power-consumption-record-with-8303-mw-amid-scorching-heat/
- Bihar State Power Holding Company Limited (official) — https://x.com/BiharEnergy/status/1935602797883392460