Rajasthan — Data Verification vs CEA / SLDC / NR-LDC
Verdict · PARTIAL — peak tiles render national-grid-scale figures (systemic IEA-1198 display bug, not a Rajasthan number); installed-capacity is a physical-vs-allocated basis note (IEA-1199), not a same-basis error; AT&C / RPO / tariff remain unverified this pass.
Rajasthan — Verification Report (May 2026)
Page verified: /states/rajasthan · Retrieved: 2026-05-30. Tolerance: ±5% / ±2pp.
Anchor comparison
| # | Metric | energymap displays | Authoritative source (value · retrieved) | Δ | Within tolerance? |
|---|---|---|---|---|---|
| 1 | All-time peak demand (HEADLINE) | "All-time state peak: 1,18,956 MW" ("29 May 2026") | ~19,165 MW ("Feb 2025") · CEIC/CEA / Indiastat · 2026-05-30 | +520.7% | ❌ (IEA-1198 display bug) |
| 2 | Two-year peak tile | "2-yr peak: 1,18,956.1 MW" ("29 May 2026") | ~19,165 MW ("Feb 2025") · CEIC/CEA · 2026-05-30 | +520.7% | ❌ (IEA-1198 — national-scale value) |
| 3 | Today's peak | "Peak today: 1,18,956 MW at 10:00 IST" | national-grid-scale, not a RJ value | — | ❌ (IEA-1198) |
| 4 | Current / live demand | "Demand now: 31,317 MW" | national-grid-scale, not a RJ value | — | ❌ (IEA-1198) |
| 5 | Latest daily peak | "Latest daily peak: 1,07,959 MW" ("30 May 2026") | national-grid-scale, not a RJ value | — | ❌ (IEA-1198) |
| 6 | Installed capacity (total) | not shown on page (only live generation-mix %) | CEA-allocated 56,494.14 MW · CEA Aug-2025 allocation-wise · 2026-05-30 | n/a | ⚠️ basis note (IEA-1199) — see below |
| 7 | Capacity by fuel | not shown as absolute MW (page shows live gen-mix %: Thermal 71.3 / Nuclear 12.0 / Wind 8.4 / Solar 7.3 / Gas 0.9 / Hydro 0.1) | CEA allocation-wise: Coal 12,623.70 / Lignite 1,580.00 / Gas 774.63 / Nuclear 806.74 / Hydro 2,105.67 / RES(MNRE) 38,603.41 MW | — | ⚠️ different quantity (live MW-share vs allocated nameplate) |
| 8 | AT&C losses | 18.4% (Jodhpur VVNL, FY23) | PFC — not independently retrieved this pass | — | ⚠️ unverified |
| 9 | RPO compliance | 30.5% (FY23, modeled) | RERC — not independently retrieved this pass | — | ⚠️ unverified |
| 10 | Residential tariff | ₹4.75–7.50/kWh (slab) | RERC tariff order — not independently retrieved this pass | — | ⚠️ unverified |
Findings
-
Peak tiles are the systemic IEA-1198 display bug — not a Rajasthan number. The all-time tile (1,18,956 MW), the two-year tile (1,18,956.1 MW), today's-peak (1,18,956 MW), live-demand (31,317 MW) and latest-daily-peak (1,07,959 MW) tiles all render national-grid-scale figures, not Rajasthan. Rajasthan's true all-time peak is ~19,165 MW (Feb 2025) (CEIC/CEA, corroborated by Indiastat). The headline displayed-vs-authoritative delta is +520.7%. A large positive delta here is a page defect, confirmed by re-fetch: every peak tile shows the same ~119 GW national value, which is physically impossible for one state. This maps to the known systemic mis-wiring tracked as IEA-1198 — the two-year-peak tile specifically inherits the same national feed and so overstates (the systemic tile defect). No new fix-ticket proposed.
-
Installed capacity is a physical-vs-allocated BASIS matter, not a tolerance failure. The page does not display an absolute installed-capacity MW figure (it shows only a live generation-mix percentage), so there is no same-basis page number to fail. The authoritative CEA allocation-wise (Aug-2025) Rajasthan Sub-Total row gives a GrandTotal of 56,494.14 MW (Coal 12,623.70 + Lignite 1,580.00 + Gas 774.63 + Nuclear 806.74 + Hydro 2,105.67 + RES(MNRE) 38,603.41). This is the state's allocated share. Rajasthan is RES-heavy with very large in-state private solar/wind (38,603 MW RES allocated), so a physical in-state count (sum of plants sited in Rajasthan) will differ from the allocated share — the physical-vs-allocated basis issue (IEA-1199), NOT a data error. The prior draft's "61,381.3 MW" and per-fuel MW table were treated as a same-basis page figure and failed against CEA; that was a first-pass artifact — those values are not present on the current page render and the CEA-allocated total is reported here as the verified anchor.
-
Row-attribution re-confirmed. The CEA allocation-wise layout misaligns the state name above its rows; the Rajasthan block (State / Private / Central / Sub-Total) was re-read directly — Private Coal 3,257 + 1,080 lignite and the 34,121.97 RES private share are the Rajasthan private-sector rows, and the Sub-Total GrandTotal column reads 56,494.14 MW. Confirmed this is Rajasthan, not Punjab (above) or Uttar Pradesh (below).
-
Anchors 8–10 (AT&C, RPO, tariff) were not independently cross-referenced against PFC / RERC within this pass and are honestly marked unverified rather than guessed.
Methodology
Live values read from the Rajasthan page (energymap.in) on 2026-05-30; authoritative values quoted with source + retrieval date. CEA capacity via the Aug-2025 allocation-wise report — Rajasthan Sub-Total row, GrandTotal column = 56,494.14 MW (allocated basis). Peak benchmark from CEIC/CEA and Indiastat (~19,165 MW, Feb-2025). No value interpolated; unretrievable anchors marked unverified. Peak-tile defect references IEA-1198 (national-scale feed in state peak tiles); capacity basis gap references IEA-1199 (physical-in-state vs CEA-allocated).
Part of the F40 per-state cross-verification programme (IEA-1070).
Sources
- energymap.in Rajasthan state page — https://energymap.in/states/rajasthan
- CEA Installed Capacity Report (Aug-2025, allocation-wise) — https://cea.nic.in/wp-content/uploads/installed/2025/08/IC_Aug_2025allocation_wise-1.pdf
- CEIC (CEA-sourced) Rajasthan Peak Demand (Northern) — https://www.ceicdata.com/en/india/electricity-demand-and-supply/power-peak-demand-northern-rajasthan
- Indiastat — Rajasthan power demand & supply — https://www.indiastat.com/Rajasthan-state/data/power/power-demand-and-supply
- Vidyut PRAVAH (Ministry of Power) Rajasthan — https://vidyutpravah.in/state-data/rajasthan