DAM Avg MCP
Across 258 blocks
DAM Peak MCP
Highest block price
DAM Floor MCP
Lowest block price
Price Spread
Peak minus floor
DAM Volume
Total cleared energy
RTM Latest
Avg ₹2,022/MWh
Std Deviation
₹3,754
/MWh today
Coeff. of Variation
77.0%
σ/μ ratio
Peak : Trough
40.2×
₹10,000 / ₹249
Blocks ≥ ₹5,000
101
of 258 blocks (39%)
Blocks ≥ ₹8,000
82
of 258 blocks (32%)
The Duck Curve
Wasted Energy
Forecasting Accuracy
Grid Stress Proxy
Investment Signal
Investment Validation
The Market Calendar
Open Access Signal
₹10,000/MWh is the IEX day-ahead/real-time price ceiling (CERC-mandated). Saturation at the cap reflects scarcity events, not data error.
Price Projection
Overall Avg
DAM lifetime
Months
History depth
Latest Month
May 26
Trend
First → last month
Open Access Economics
Buying from IEX during 06:00–18:00 saves ₹5.32/kWh (74.4%) vs your APSPDCL rate
Off-Peak
00:00–06:00
vs ₹7.15/kWh · 48 blocks
Solar Hours
06:00–18:00
vs ₹7.15/kWh · 138 blocks
Evening Peak
18:00–23:00
vs ₹7.15/kWh · 60 blocks
Night
23:00–00:00
vs ₹7.15/kWh · 12 blocks
Full Day Average
vs ₹7.15/kWh · 258 blocks
Annual Savings Projection (Illustrative)
1 MW load
₹2.0 Cr/yr
5 MW load
₹10.0 Cr/yr
10 MW load
₹19.9 Cr/yr
Based on today's full-day average IEX price vs APSPDCL HT rate. Excludes open access charges (CSS, wheeling, transmission losses). Phase 3a will add full open access cost stack.
Open Access Economics
Data Center Economics
DISCOM Only
Andhra Pradesh HT Industrial
₹87.7 Cr/yr
Eff. rate: ₹7.15/kWh
IEX Full-Day
24×7 open access via IEX
₹59.8 Cr/yr
Eff. rate: ₹4.87/kWh
Save ₹27.9 Cr/yr (32% vs DISCOM)
Hybrid Optimal
IEX solar hours + DISCOM peak
₹55 Cr/yr
Eff. rate: ₹4.49/kWh
Save ₹32.6 Cr/yr (37% vs DISCOM)
Estimates based on today's IEX DAM prices and state HT industrial tariff rates. Solar hours: 06:00–18:00 IST. Excludes open access charges (CSS, additional surcharge, wheeling, transmission losses). Actual costs depend on contract demand, power factor, and regulatory approvals. Phase 3a will add full open access cost modeling.
Green Energy Markets
| Session | Type | Clearing ₹ | Volume | Floor ₹ | Ceiling ₹ |
|---|---|---|---|---|---|
| Apr 26 | combined | ₹370 | 71,014 | — | — |
| Apr 26 | combined | ₹339 | 46,799 | — | — |
Grid Stability
Alert Engine
Feasibility Engine
Real-Time Market
Block-Level Data
| 23:45 | DAM | 8,555.8MW | 3,707.6MW | 2,901.4MW | ₹10,000 |
| 23:30 | DAM | 8,814.6MW | 3,693.4MW | 2,887.2MW | ₹10,000 |
| 23:15 | DAM | 9,543.8MW | 4,047.5MW | 2,887.7MW | ₹10,000 |
| 23:00 | DAM | 9,632.1MW | 4,122.3MW | 2,944.9MW | ₹10,000 |
| 22:45 | DAM | 10,354.9MW | 4,646.8MW | 3,021.7MW | ₹10,000 |
| 22:30 | DAM | 10,841.8MW | 4,754.6MW | 3,076.8MW | ₹10,000 |
| 22:15 | DAM | 10,823.6MW | 5,235.7MW | 3,557.9MW | ₹10,000 |
| 22:00 | DAM | 9,286.7MW | 5,523.2MW | 3,792.6MW | ₹10,000 |
| 21:45 | DAM | 8,529.6MW | 5,528.4MW | 3,797.8MW | ₹10,000 |
| 21:30 | DAM | 8,236.6MW | 5,791.2MW | 4,060.6MW | ₹10,000 |
| 21:15 | DAM | 8,182.8MW | 5,817.4MW | 4,081.8MW | ₹10,000 |
| 21:00 | DAM | 7,930.4MW | 5,831.9MW | 4,096.3MW | ₹10,000 |
| 20:45 | DAM | 7,449MW | 5,738.4MW | 3,991.8MW | ₹10,000 |
| 20:30 | DAM | 7,362.6MW | 5,702.9MW | 3,956.3MW | ₹10,000 |
| 20:15 | DAM | 7,173MW | 6,104.8MW | 3,928.2MW | ₹8,189.39 |
| 20:00 | DAM | 7,091.8MW | 6,211.7MW | 3,831.5MW | ₹7,499.61 |
| 19:45 | RTM | 8,676.6MW | 13,596.3MW | 8,566.1MW | ₹2,000.62 |
| 19:45 | DAM | 7,643.8MW | 6,465.2MW | 4,081.9MW | ₹7,499.79 |
| 19:30 | RTM | 8,922.3MW | 13,689.9MW | 8,759.1MW | ₹2,199.34 |
| 19:30 | DAM | 7,828.7MW | 6,295.4MW | 4,249.1MW | ₹8,189.65 |
| 19:15 | DAM | 7,529.9MW | 6,555.4MW | 4,071.9MW | ₹6,999.99 |
| 19:15 | RTM | 9,221MW | 12,899.9MW | 8,331.7MW | ₹2,680.61 |
| 19:00 | RTM | 9,259.8MW | 13,746.6MW | 8,731.1MW | ₹2,499.75 |
| 19:00 | DAM | 7,084.8MW | 6,959.4MW | 3,937.2MW | ₹5,900.82 |
| 18:45 | DAM | 5,916.1MW | 7,821.7MW | 3,763MW | ₹4,789.04 |
| 18:45 | RTM | 9,431.9MW | 13,071.6MW | 7,446.8MW | ₹2,789.7 |
| 18:30 | DAM | 5,181.2MW | 7,878.6MW | 3,151.2MW | ₹4,549.28 |
| 18:30 | RTM | 9,562.2MW | 13,956.6MW | 7,648.4MW | ₹2,820.03 |
| 18:15 | DAM | 5,362MW | 10,254.4MW | 3,605.5MW | ₹3,986.82 |
| 18:15 | RTM | 8,010.6MW | 17,036.9MW | 7,883MW | ₹1,164.89 |
| 18:00 | DAM | 5,283.5MW | 12,765.4MW | 4,174.6MW | ₹999.64 |
| 18:00 | RTM | 7,956.6MW | 18,970.6MW | 7,884.8MW | ₹999.43 |
| 17:45 | RTM | 10,440.8MW | 19,711.8MW | 9,109.7MW | ₹2,500.02 |
| 17:45 | DAM | 6,058.1MW | 14,750MW | 4,787.5MW | ₹1,976.68 |
| 17:30 | DAM | 5,820.2MW | 14,882.6MW | 4,751.7MW | ₹700.6 |
| 17:30 | RTM | 11,154.1MW | 21,135.2MW | 9,959.6MW | ₹2,400.66 |
| 17:15 | DAM | 5,835MW | 18,334.6MW | 4,686.4MW | ₹780.62 |
| 17:15 | RTM | 11,474.2MW | 24,594.3MW | 11,069.6MW | ₹2,019.54 |
| 17:00 | DAM | 5,890.4MW | 21,369.6MW | 4,822.9MW | ₹300.95 |
| 17:00 | RTM | 12,053.2MW | 26,044.4MW | 11,705.5MW | ₹1,969.82 |
| 16:45 | DAM | 6,165.1MW | 25,768.7MW | 5,108.4MW | ₹300.74 |
| 16:45 | RTM | 12,455.1MW | 28,978.3MW | 12,062.9MW | ₹1,949.08 |
| 16:30 | DAM | 6,115.6MW | 27,070.8MW | 5,058.9MW | ₹300.71 |
| 16:30 | RTM | 13,055.6MW | 29,980.2MW | 12,667.3MW | ₹1,880.41 |
| 16:15 | RTM | 13,569.5MW | 31,832MW | 13,076.3MW | ₹1,801.23 |
| 16:15 | DAM | 5,922MW | 29,325.6MW | 4,877.3MW | ₹300.65 |
| 16:00 | RTM | 13,045.3MW | 33,510.8MW | 12,641MW | ₹1,516.56 |
| 16:00 | DAM | 6,017.8MW | 30,505.8MW | 4,973.1MW | ₹300.81 |
| 15:45 | RTM | 13,644MW | 35,035.7MW | 12,948.9MW | ₹1,501.01 |
| 15:45 | DAM | 5,395MW | 32,588.7MW | 5,088.4MW | ₹1,700.79 |