Uttar Pradesh — Data Verification vs CEA / SLDC / NR-LDC
Verdict · FAIL — headline all-time peak tile understates the verified UPSLDC record by -38.5% (modeled-demand series, systemic IEA-1198). Installed capacity is a physical-vs-allocated BASIS difference (+12.4%, IEA-1199), NOT a data error.
Uttar Pradesh — Verification Report (May 2026)
Page verified: /states/uttar-pradesh · Retrieved: 2026-05-30. Tolerance: ±5% / ±2pp.
Peak demand — the four distinct fields
The UP page exposes several demand fields that must NOT be conflated. On 2026-05-30 they all derive from the modeled state-demand series (modeled_state_demand_v1, confirmed via the /today API):
| Field on page | Value | Date shown |
|---|---|---|
| Current demand ("Demand now") | 17,610 MW | live |
| Today's peak ("Peak today") | 19,579 MW | 10:00 IST |
| Two-year peak | 19,579.2 MW | "2026-05-29" |
| All-time peak ("POSOCO all-time peak") | 19,579 MW | "2026-05-29" |
All four collapse onto ~19,579 MW because the page's peak history is built from the modeled-demand feed, which caps well below the true grid peak. The authoritative UPSLDC record is 31,824 MW.
Anchor comparison
| # | Metric | energymap displays | Authoritative source (value · retrieved) | Δ | Within tolerance? |
|---|---|---|---|---|---|
| 1 | Peak demand (HEADLINE: all-time peak tile vs record) | 19,579 MW (all-time peak tile, "2026-05-29") | 31,824 MW all-time record, "2026-05-24" (UPSLDC) · Organiser · 2026-05-30 | −38.5% | ❌ (IEA-1198) |
| 1b | Two-year peak tile | 19,579.2 MW ("2026-05-29") | ≥ 31,824 MW within window (record fell 2026-05-24) | understates | ❌ (IEA-1198) |
| 2 | Installed capacity (total) | 39,034.7 MW (physical in-state, 9 plants) | 34,726.30 MW CEA allocation-wise GrandTotal · CEA Aug-2025 · 2026-05-30 | +12.4% | ✅ basis-explained (IEA-1199) |
| 3 | Capacity by fuel | Coal 30,035 · RES 6,564.9 · Gas 1,493.1 · Hydro 501.6 · Nuclear 440.0 MW | CEA Aug-2025 allocation-wise: Coal 23,894.8 · Thermal-total 24,924.3 · RES 5,847.6 · Hydro 3,584.0 · Nuclear 370.5 MW | — | ✅ basis mismatch (IEA-1199) |
| 4 | AT&C losses | 27.9% (MVVNL, FY23) / 17.9% (PVVNL, FY23) | PFC Integrated Rating — not retrieved | — | ⚠️ unverified |
| 5 | RPO compliance | 13.6% (FY23, modeled) | UERC — not retrieved | — | ⚠️ unverified |
| 6 | Residential tariff | ₹3.00/kWh (Lifeline 0–100 kWh) | UPERC tariff order — not retrieved | — | ⚠️ unverified |
| 7 | Interchange / RT demand | Imports 11,081 MW (projected, NR) | NR-LDC PSP / UPSLDC — not retrieved | — | ⚠️ unverified |
Findings
- Peak demand is the headline failure (genuine, same-basis). The page's all-time peak tile reads 19,579 MW, but UPSLDC met a verified all-time record of 31,824 MW on "2026-05-24" at ~22:29 IST — the highest peak met by any Indian state in 2025-26, surpassing the prior 31,486 MW benchmark (June 11, 2025). That is a −38.5% understatement, far outside ±5%. The root cause is that all of the page's peak fields are derived from the modeled state-demand series, which caps near ~19.6 GW; this is the known systemic IEA-1198 (two-year / all-time peak tiles understate high-demand states). This is a NEGATIVE delta (page << authoritative), i.e. a real understatement, not a misread — no new fix-ticket proposed per instructions.
- The two-year peak tile (19,579 MW) is the same IEA-1198 understatement — it should sit at or above the record (≥31,824 MW within the trailing window). Referenced, no new ticket.
- Installed capacity is a BASIS difference, NOT an error. The page shows 39,034.7 MW = the sum of 9 plants physically located in UP (infra-counts API). CEA's allocation-wise table reports UP's allocated share = 34,726.30 MW (Sub-Total GrandTotal row, verified to belong to the Uttar Pradesh block, not the adjacent Rajasthan/Uttarakhand rows). The +12.4% / +4,308 MW gap is the classic physical-vs-allocated signature: displayed coal (30,035 MW) sits well above CEA allocated coal (23,894.8 MW) because UP hosts large in-state thermal whose central/private output is allocated out to other states; conversely displayed hydro (501.6 MW) sits far below CEA allocated hydro (3,584.0 MW), which is mostly UP's imported share of central-sector hydro outside the state. This is the physical-vs-allocated basis issue (IEA-1199), explicitly NOT a tolerance failure.
- Anchors 4–7 are honestly marked unverified — no authoritative PFC / UERC / UPERC / NR-LDC source was retrieved in this pass; no value was interpolated or guessed.
Verdict
FAIL — driven by a single genuine, same-basis breach: the all-time peak tile understates the verified UPSLDC record by −38.5% (19,579 MW vs 31,824 MW), the systemic modeled-peak bug IEA-1198. Installed capacity (+12.4%) is reclassified from the first pass as basis-explained PASS (physical in-state vs CEA allocated, IEA-1199), not a data error. Anchors 4–7 remain unverified.
Methodology
Live values read from the Uttar Pradesh page on 2026-05-30; peak provenance confirmed via https://api.energymap.in/api/states/uttar-pradesh/today (source modeled_state_demand_v1); displayed installed capacity confirmed via https://api.energymap.in/api/states/uttar-pradesh/infra-counts (installed_capacity_mw = 39,034.7; per-fuel as tabulated). CEA capacity via the Aug-2025 allocation-wise report, Sub-Total GrandTotal row for Uttar Pradesh = 34,726.30 MW (Coal 23,894.77 · Gas 1,029.51 · Thermal-total 24,924.28 · Nuclear 370.45 · Hydro 3,584.02 · RES 5,847.55). All authoritative values quoted with source + retrieval date. No value interpolated.
Part of the F40 per-state cross-verification programme (IEA-1070).
Sources
- UPSLDC record peak 31,824 MW (via Organiser) — https://organiser.org/2026/05/27/355285/bharat/uttar-pradesh-yogi-government-records-highest-ever-electricity-supply-surpasses-maharashtra/
- UP national peak-demand record 2025-26 (Oneindia) — https://www.oneindia.com/india/up-pradesh-sets-record-peak-electricity-demand-2025-2026-012-8098843.html
- CEA Installed Capacity Report (Aug-2025, allocation-wise) — https://cea.nic.in/wp-content/uploads/installed/2025/08/IC_Aug_2025allocation_wise-1.pdf
- energymap infra-counts API (UP) — https://api.energymap.in/api/states/uttar-pradesh/infra-counts