Demand — actual & forecast
issued 2 Oct, 23:00 IST
Uttar Pradesh is drawing 22,594 MW of electricity at the current hour (2026-10-03T00:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Uttar Pradesh is dominated by Coal at 92.9%. Grid carbon intensity is 895 gCO2/kWh.
Hourly disaggregation for Uttar Pradesh is awaiting the cross-project Atlas DISCOM Disaggregation tier-A endpoint; once it lands the live page will surface P10/P50/P90 bands without any FE change.
The day-ahead hourly demand forecast for Uttar Pradesh publishes a ±1.5σ band over the next 24 hours — per-state model v21 (holdout MAPE 4.8%); level-calibrated x1.10 vs canonical trailing 24h.
Composed at 2026-10-03T00:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Weather sensitivity
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Uttar Pradesh because no audited live SLDC interval served-load actual; the available source is modeled, a daily peak, dead/restricted, or otherwise outside the pinned L(s,t) estimand. Accuracy scoring requires an independent interval actual.
Verified <5% on the leak-free IEA-1763 spike; the live-served forecast is currently above target (serving-side level/staleness artifact) pending the recommended calibration deploy.
Median gCO₂/kWh · day-of-week × hour-of-day (IST)
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
We do not show a solar capture-rate for Uttar Pradesh because no audited live SLDC interval served-load actual; the available source is modeled, a daily peak, dead/restricted, or otherwise outside the pinned L(s,t) estimand. Accuracy scoring requires an independent interval actual.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 23:30 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 23:30 IST
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange over-drawal +1742 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -347 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -412 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -661 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -337 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -348 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -449 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -378 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -426 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -348 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +324 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +501 MW vs schedule
Inter-state transfer · POSOCO PSP daily
An hourly residential cost curve isn't published for Uttar Pradesh yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Schedule | Slab | Energy rate (₹/kWh) |
|---|---|---|
| LMV-1-OTHER | 0–100 kWh | ₹5.50 |
| LMV-1-OTHER-LIFELINE | 0–100 kWh | ₹3.00 |
| LMV-1-BULK | 0+ kWh | ₹7.00 |
| LMV-1-RURAL-LIFELINE | 0–100 kWh | ₹3.00 |
| LMV-1-RURAL-OTHER | 0–100 kWh | ₹3.35 |
| LMV-1-RURAL-OTHER | 100–150 kWh | ₹3.85 |
| LMV-1-OTHER | 100–150 kWh | ₹5.50 |
| LMV-1-RURAL-OTHER | 150–300 kWh | ₹5.00 |
3 additional slabs hidden.
10-Year Tariff History
Published slab rates · no derived averages
DISCOM Health
Madhyanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
27.9%
Latest
Paschimanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
17.9%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.