ENERGY NEWS · 1 SOURCE
Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables
The Bihar Electricity Regulatory Commission (BERC) has proposed that wind and solar projects with battery energy storage systems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output to at least 105% of the operating…
Figures in the reporting
Explore SignalsExtracted from the stored headline and excerpt. These are reported claims, with source context; they are not independently verified measurements.
10 MWattery energy storage systems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output toSource evidence ↗33 kVystems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output to at least 105% of the oSource evidence ↗105%her, must be capable of increasing their output to at least 105% of the operating…Source evidence ↗
Coverage & sources
1 reportsRelated coverage grouped by headline, figures, place and time; check original sources.
- Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables
Mercom India · 12 Aug, 12:09 am IST
Discussion
Keep it curious. Keep it civil.Loading discussion…