RPC settlement actuals
OfficialPhysical settlement entities aggregated to their host state. Positive values are exports; negative values are imports. Bilateral paths are not inferred.
Current-hour estimate coverage
This is a separate near-real-time operating estimate. Measured means operator drawal or schedule feeds; blended combines fresh demand with modeled in-state generation; modeled is an estimate.Current-hour operating estimate
A different, faster data product from the settlement explorer above. An estimate that fails a physical balance check, such as generation above installed capacity or All-India exports and imports that do not balance, is shown as Estimate withheld.| Telemetry | |||||||
|---|---|---|---|---|---|---|---|
Chhattisgarh blended_state_balance_v1 | Western | +14,671 MW Export | +4,346 MW | +19,017 MW | Blended 72% conf. | Drawal 2,373 Sched 2,417 Dev -44 | 06:30 IST·Live |
Maharashtra blended_state_balance_v1 | Western | -8,477 MW Import | +25,535 MW | +17,058 MW | Blended 72% conf. | Drawal 7,930 Sched 8,024 Dev -94 | 06:30 IST·Live |
Karnataka modeled_state_balance_v1 | Southern | -7,493 MW Import | +14,494 MW | +7,001 MW | Modeled 45% conf. | Drawal 7,598 Sched 6,987 Dev 611 | 06:30 IST·Live |
Gujarat blended_state_balance_v1 | Western | -6,359 MW Import | +16,362 MW | +10,003 MW | Blended 72% conf. | Drawal 8,502 Sched 8,601 Dev -98 | 06:30 IST·Live |
Bihar modeled_state_balance_v1 | Eastern | +3,976 MW Export | +3,971 MW | +7,947 MW | Modeled 45% conf. | Drawal 3,630 Sched 3,765 Dev -135 | 04:30 IST·Partial |
Punjab modeled_state_balance_v1 | Northern | -3,747 MW Import | +7,123 MW | +3,376 MW | Modeled 45% conf. | Drawal 3,196 Sched 3,573 Dev -376 | 06:30 IST·Live |
Rajasthan modeled_state_balance_v1 | Northern | -3,686 MW Import | +13,020 MW | +9,334 MW | Modeled 45% conf. | Drawal 3,859 Sched 4,273 Dev -413 | 05:30 IST·Partial |
Kerala modeled_state_balance_v1 | Southern | -3,553 MW Import | +3,875 MW | +322 MW | Modeled 45% conf. | Drawal 3,233 Sched 3,202 Dev 31 | 05:30 IST·Partial |
Uttar Pradesh blended_state_balance_v1 | Northern | +3,501 MW Export | +14,898 MW | +18,399 MW | Blended 72% conf. | Drawal 2,663 Sched 2,545 Dev 118 | 05:30 IST·Partial |
Tamil Nadu modeled_state_balance_v1 | Southern | -3,310 MW Import | +13,174 MW | +9,864 MW | Modeled 45% conf. | Drawal 9,879 Sched 10,092 Dev -213 | 06:30 IST·Live |
West Bengal modeled_state_balance_v1 | Eastern | +3,194 MW Export | +4,999 MW | +8,193 MW | Modeled 45% conf. | Drawal 1,023 Sched 1,075 Dev -53 | 06:30 IST·Live |
Delhi modeled_state_balance_v1 | Northern | -2,828 MW Import | +3,309 MW | +482 MW | Modeled 45% conf. | Drawal 2,781 Sched 2,852 Dev -71 | 06:30 IST·Live |
Madhya Pradesh modeled_state_balance_v1 | Western | +2,749 MW Export | +13,231 MW | +15,981 MW | Modeled 45% conf. | Drawal 8,790 Sched 8,991 Dev -201 | 04:30 IST·Partial |
Himachal Pradesh modeled_state_balance_v1 | Northern | +1,480 MW Export | +860 MW | +2,340 MW | Modeled 45% conf. | Drawal 247 Sched 246 Dev 3 | 06:30 IST·Live |
Andhra Pradesh modeled_state_balance_v1 | Southern | -1,347 MW Import | +9,900 MW | +8,553 MW | Modeled 45% conf. | Drawal 3,875 Sched 3,869 Dev 5 | 06:30 IST·Live |
Telangana modeled_state_balance_v1 | Southern | -1,038 MW Import | +10,840 MW | +9,802 MW | Modeled 45% conf. | Drawal 3,685 Sched 3,694 Dev -8 | 05:30 IST·Partial |
Goa blended_state_balance_v1 | Western | -544 MW Import | +544 MW | 0 MW | Blended 72% conf. | Drawal 532 Sched 545 Dev -13 | 05:30 IST·Partial |
Arunachal Pradesh modeled_state_balance_v1 | North Eastern | +454 MW Export | +126 MW | +580 MW | Modeled 45% conf. | Drawal 132 Sched 138 Dev -6 | 04:30 IST·Partial |
Assam modeled_state_balance_v1 | North Eastern | -359 MW Import | +1,175 MW | +816 MW | Modeled 45% conf. | Drawal 959 Sched 947 Dev 12 | 04:30 IST·Partial |
Andaman and Nicobar Islands modeled_state_balance_v1 | Eastern | -1 MW Import | +38 MW | +37 MW | Modeled 45% conf. | Drawal — Sched — Dev — | 04:30 IST·Partial |
Ordered by absolute net flow magnitude over the last 48 hours.
Revised on . See the correction
Regional Grid Structure
Structural reference for the five synchronous grid regions behind the live table.Northern Region (NR)
NRLDCSurplusJ&K, HP, Punjab, Haryana, Rajasthan, UP, Uttarakhand, Delhi, Chandigarh
Peak Load
62 GW
Capacity
110 GW
Western Region (WR)
WRLDCSurplusGujarat, Maharashtra, MP, Chhattisgarh, Goa, DNH&DD
Peak Load
72 GW
Capacity
130 GW
Southern Region (SR)
SRLDCDeficitAP, Telangana, Karnataka, Kerala, TN, Puducherry
Peak Load
55 GW
Capacity
95 GW
Eastern Region (ER)
ERLDCSurplusWB, Bihar, Jharkhand, Odisha, Sikkim
Peak Load
25 GW
Capacity
55 GW
North-Eastern Region (NER)
NERLDCSurplusAssam, Meghalaya, Tripura, Manipur, Mizoram, Nagaland, Arunachal
Peak Load
4 GW
Capacity
8 GW
Interstate Transmission Corridors
Reference ISTS capacity — context for the state-based live table.| Corridor | Capacity (GW) | Voltage | Key Link | Status |
|---|---|---|---|---|
| NR -> SR | 16.5 | 765 kV HVDC + HVAC | Raigarh-Pugalur HVDC (6 GW) | Operational |
| WR -> SR | 12 | 765 kV HVAC | Wardha-Nizamabad-Kurnool | Operational |
| ER -> NR | 10.5 | 765 kV HVAC | Biharsharif-Lucknow-Agra | Operational |
| ER -> SR | 6 | 765 kV HVAC | Dharamjaygarh-Sipat-Srikakulam | Operational |
| WR -> NR | 14 | 765 kV HVAC | Multiple Champa-Kurukshetra corridors | Operational |
| NER -> ER | 3.5 | 400 kV HVAC | Bongaigaon-Alipurduar | Operational |
| Leh-Ladakh Solar | 13 | 800 kV HVDC | Leh-Kaithal Green Energy Corridor | Under Construction |
| Rajasthan RE Corridor | 20 | 765 kV HVAC | Bhadla-Fatehgarh-Bikaner evacuation | Partially Operational |
| Gujarat RE Corridor | 30 | 765 kV HVAC + HVDC | Khavda RE Zone evacuation | Under Construction |