A national register of India's substation projects, with the network model to say what each one changes.

The Substation Tracker is a register of substation projects in India. Each record carries the substation, its voltage, its owner, its state, the stage it has reached — planned, sanctioned, under construction, commissioned — the expected or actual commissioning date, the capital cost where published, and a link to the document the entry came from.

Records are re-checked on a schedule. When a project moves stage, slips a date or changes scope, the change is kept alongside the original entry, so the tracker shows the history of a project and not only its present state.

30 minutes, online, on your own sites and numbers. Or email hello@energymap.in.

Product walkthrough. Starts muted.
States & UTs (of 36)
34
Substations + junctions
28,744
Lines modelled
31,453
≥132 kV lines parameterised
100%

Underneath the tracker

A national DC power-flow model

Most substation lists tell you what is being built. The tracker sits on a network model, so it can also tell you what that changes.

We maintain the India Grid Graph: a single conflated network of 28,744 substations and junctions and 31,453 transmission lines across 34 of India's 36 states and union territories, built from CEA filings, state transmission utility registers and satellite-derived geometry. Every exported AC line at 132 kV and above carries resistance, reactance and a thermal rating, so it is an electrical model rather than a map.

A DC power flow solves on the state-reduced network — 34 nodes and the inter-state corridors between them — against measured interchange and published regional flows. That is what lets us answer where a new injection or a new block of load redistributes nationally, instead of stopping at the fence of one substation.

Stated plainly: the solved flow case is state-and-corridor resolution today. Full nodal solve at individual substation level is in build, and we will show you exactly what resolves and what does not on the call. We would rather lose a deal than oversell a model.

Network
28,744 nodes / 31,453 edges
Coverage
34 of 36 states and union territories
Electricals
r / x / rating on every ≥132 kV line
Solved case
State-reduced, 34 nodes + corridors
Calibration
Measured interchange + regional flows
Evidence
The order or filing behind every record

Who uses it

Three decisions it is built for

Data centre developers

Will this site have power when the building is ready?

Land, utility approval and construction run on different calendars, and the one that slips is usually power. The tracker shows which substations near a shortlisted site are being built or uprated, how much capacity is being added and when it is expected to energise — so a site is ranked on grid delivery dates, not just on fibre and floor plate.

  • Substation additions and uprates within range of a shortlist
  • Expected energisation dates, and the slippage history behind them
  • The published document behind every date, for the board paper

Solar & wind developers

Which corridor will actually evacuate this plant?

Resource is the easy part; evacuation decides the project. Track the 220 kV and 400 kV substations and lines being added in a resource zone, with sanction and commissioning dates, so a bid is placed into a corridor that will exist when the plant does — and so a connection application is filed against the right bay.

  • EHV additions by state and voltage, filterable to a resource zone
  • Which projects are sanctioned versus merely announced
  • Transmission build that changes a zone's evacuation picture

BESS developers

Where does storage still earn once the wires arrive?

A battery is paid for congestion and for spread. Both move when the network changes. Read substation and line additions against our IEX price forecasts to find nodes where relief is late or partial and the arbitrage holds through the asset's life, rather than siting into a constraint that clears in year two.

  • Network reinforcement dates for the zone under evaluation
  • The same platform's DAM, RTM and G-DAM price forecasts
  • Interconnection points where relief is deferred, not delivered

In the workspace

Map and table, one filter set

Project lifecycle

Planned, sanctioned, under construction, commissioned and operational assets, with upgrades and expected commissioning dates.

Filter and rank

Filter by state, voltage, project driver, review status and alert tier; sort by date, capital cost or priority.

Related demand

Move between substation projects, large loads, data-centre announcements and tariff changes without losing the source trail.

Evidence

Inspect the source, confidence and review state behind each entry, plus lifecycle and asset-history fields where available.

The map, tables and the underlying records are part of the Enterprise plan. Nothing is loaded on this page until an account is entitled.

Next step

See it on your own sites

Name the states, the corridor or the shortlist you are working on. We open the tracker on those, and you keep whatever we pull up.

Book a Substation Tracker demo

30 minutes · online
Pick a time

Times are in your local timezone. Any time works — no preset slots, no business-hour restrictions.

The more specific you are, the more of the demo we spend on your numbers instead of ours.

18/2000

Or start from one of these

We email you a confirmation right away. No newsletter signup, no third-party scheduler.

Substation Tracker — India's substation projects, with a national grid model | India Energy Atlas