Capacity for a new load: Tamil Nadu Modelled

Study window 14–27 Sep 2026Any single line or transformer out

Connection buses

158

230 kV and above

300 MW or more

11

buses

100–300 MW

41

buses

Under 100 MW

102

buses

Firm capacity by station

300 MW or more
117%
100–300 MW
4127%
Under 100 MW
10266%

Station map, MW figures and limiting elements. Available on Enterprise.Compare plans

300 MW or more

  1. 1Dharmapuri400 kV300 MW or more
  2. 3Salem400 kV300 MW or more
  3. 4Kanarpatty230 kV300 MW or more
  4. 5Kayathar230 kV300 MW or more
  5. 7Sankaneri(WF)230 kV300 MW or more
  6. 8Savasapuram230 kV300 MW or more
  7. 9Tuticorin Auto230 kV300 MW or more

All connection buses

1–25 of 158 buses
Page 1 of 7

Accuracy

Flow direction right

89%

meters the model never saw

Typical flow error

79–122MW

median, per metered line

Weighted error

25–34%

of metered flow

Flow correlation

0.90–0.93

median r, modelled vs metered

  • Study window is two September weeks; summer peak brings higher demand and lower ambient ratings.
  • 230 kV TANTRANSCO flows are modelled, not metered; those stations carry the widest ranges.
  • Short-circuit, voltage and stability are not studied. Indicative, not a connection offer.