Demand — actual & forecast
issued 2 Oct, 23:00 IST
Goa is drawing 576 MW of electricity at the current hour (2026-10-03T00:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest estimated in-state generation mix for Goa is dominated by Coal at 88.7%. Grid carbon intensity is 844 gCO2/kWh.
Hourly disaggregation for Goa is awaiting the cross-project Atlas DISCOM Disaggregation tier-A endpoint; once it lands the live page will surface P10/P50/P90 bands without any FE change.
The day-ahead hourly demand forecast for Goa publishes a ±1.5σ band over the next 24 hours — per-state model v20 (holdout MAPE 5.0%); level-calibrated x1.25 vs canonical trailing 24h.
Composed at 2026-10-03T00:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Weather sensitivity
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Goa because no audited live SLDC interval served-load actual; the available source is modeled, a daily peak, dead/restricted, or otherwise outside the pinned L(s,t) estimand. Accuracy scoring requires an independent interval actual.
no metered SLDC feed for this state; the 48h-forecast accuracy would be model-vs-modeled (self-referential), so it is not scored. Excluded from the verified-<5% set regardless of measured MAPE.
Median gCO₂/kWh · day-of-week × hour-of-day (IST)
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Latest actual
Shortfall
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
We do not show a solar capture-rate for Goa because no audited live SLDC interval served-load actual; the available source is modeled, a daily peak, dead/restricted, or otherwise outside the pinned L(s,t) estimand. Accuracy scoring requires an independent interval actual.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 00:30 IST
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Daily analytics cache
30D avg peak
2026-10-02
YoY peak shift
30D vs prior year
Load factor
729 daily rows
Shortage days
11 MU
30D carbon avg
derived daily layer
Weather-load link
90 joined days
Data centers
0 MW mapped
Fiber routes
9 route segments
Digital infra basis
State bounds route estimate
Weather link
Temperature vs daily peak load
An hourly residential cost curve isn't published for Goa yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Schedule | Slab | Energy rate (₹/kWh) |
|---|---|---|
| LTDS-III | 0–100 kWh | ₹3.15 |
| LTDS-I-BPL | 0–100 kWh | ₹1.50 |
| LTDS-II | 0–100 kWh | ₹2.10 |
| LTDS-III | 100–200 kWh | ₹4.15 |
| LTDS-II | 100–200 kWh | ₹3.10 |
| LTDS-III | 200–300 kWh | ₹5.20 |
| LTDS-II | 200–300 kWh | ₹4.15 |
| LTDS-II | 300–400 kWh | ₹5.45 |
3 additional slabs hidden.
10-Year Tariff History
Published slab rates · no derived averages
DISCOM Health
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.