Nagaland live electricity demand, fuel mix, and carbon intensity from the India Energy Atlas state-page-live snapshot.
Latest peak
170.7 MW
2-yr peak
170.7 MW
2-yr average
129 MW
Most recent: 2026-06-18
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Nagaland because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
A carbon scorecard isn't published for Nagaland yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
Shortfall
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No solar capture-rate payload returned for Nagaland.
Reliability — POSOCO PSP
All-time state peak
2026-06-18
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
No shortage in window
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
An hourly residential cost curve isn't published for Nagaland yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
NERC (Nagaland Electricity Regulatory Commission) · 1 DISCOM
| Slab | ₹/kWh |
|---|---|
| 0–30 kWh | ₹5.90 |
| 31–100 kWh | ₹6.40 |
| 101–250 kWh | ₹7.15 |
| 250+ kWh | ₹7.80 |
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.