Jammu and Kashmir live electricity demand, fuel mix, and carbon intensity from the India Energy Atlas state-page-live snapshot.
Latest peak
2,469.2 MW
2-yr peak
2,619.1 MW
2-yr average
2,320 MW
Most recent: 2026-06-18
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Jammu and Kashmir because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
A carbon scorecard isn't published for Jammu and Kashmir yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
Shortfall
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
We do not show a solar capture-rate for Jammu and Kashmir because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
Reliability — POSOCO PSP
All-time state peak
2026-06-17
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
No shortage in window
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
No congestion or severe events in this window.
Daily analytics cache
30D avg peak
2026-06-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
0 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
0 MW mapped
Fiber routes
149 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Jammu and Kashmir yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
JERC (Joint Electricity Regulatory Commission for UT of J&K and UT of Ladakh) / JERC · 2 DISCOMs
| Slab | ₹/kWh |
|---|---|
| 0–30 kWh | ₹1.40 |
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.