Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Karnataka is drawing 12,037 MW of electricity at the current hour (2026-08-18T01:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Karnataka is dominated by Coal at 57.5%. Grid carbon intensity is 551 gCO2/kWh.
Demand for Karnataka is sourced from a live SLDC scrape (metered, no disaggregation needed).
The day-ahead hourly demand forecast for Karnataka publishes a ±1.5σ band over the next 24 hours — based on 30 similar days across 3 years; level-calibrated x1.35 vs canonical trailing 24h.
Composed at 2026-08-18T01:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 17:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 17:45 IST
Latest peak
15,874 MW
2-yr peak
18,655 MW
Most recent: 2026-08-14
Weather sensitivity
Weather correlation data is not available for this state yet.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
Verified <5% on the leak-free IEA-1763 spike; the live-served forecast is currently above target (serving-side level/staleness artifact) pending the recommended calibration deploy.
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 01:30 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 01:30 IST
Reliability — POSOCO PSP
All-time state peak
2026-03-13
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2026-04-25
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange over-drawal +317 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +357 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +468 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +438 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +339 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +364 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +436 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +302 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +333 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +347 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -342 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -442 MW vs schedule
Inter-state transfer · POSOCO PSP daily
An hourly residential cost curve isn't published for Karnataka yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Schedule | Slab | Energy rate (₹/kWh) |
|---|---|---|
| HT-4 · 11 kV | 0+ kWh | ₹7.00 |
| LT-1 | 0+ kWh | ₹5.80 |
10-Year Tariff History
Residential · 3 orders
Published slab rates · no derived averages
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
The Karnataka Electricity Regulatory Commission (KERC) has proposed the Draft Electricity Supply Regulations, 2026, consolidating the state’s rules governing electricity connections, metering, billing, security deposits, power supply to buildings, consumer installations, and…
Syndicated from Mercom India · Open original →
Listen to this article The Karnataka Power Corporation (KPCL) has invited bids for consultancy services to prepare a detailed project report (DPR) for the 2,500
Syndicated from Mercom India · Open original →
The Industrial Transition Accelerator (ITA), a global multi-stakeholder initiative launched at COP28 to fast-track industrial transition across energy-intensive industries and transport sectors, has now announced the selection of 11 projects that will receive tailored support…
Syndicated from Saur Energy International · Open original →

MiniMines Cleantech Solutions Pvt. Ltd. has secured a patent from the Indian Patent Office for its proprietary Hybrid Hydrometallurgy (HHMR) technology, marking a significant development in its efforts to strengthen India's critical mineral recovery and battery recycling…
Syndicated from Saur Energy International · Open original →

The solar project will supply electricity to commercial and industrial (C&I) customers, with CtrlS Datacenters Bangalore among the key offtakers.
Syndicated from PV Magazine India · Open original →
Syndicated from Power Line Magazine · Open original →
Syndicated from Power Line Magazine · Open original →
West Bengal's energy sector is entering its most consequential stretch in years. The state's new BJP government, sworn in under Chief Minister Suvendu Adhikari after the party's landslide win in the April-May 2026 assembly election ending 15 years of TMC rule, inherits a…
Syndicated from Saur Energy International · Open original →

Engineering, procurement and construction company Dilip Buildcon’s board of directors has approved the divestment of its stakes in an under-construction solar project in Madhya Pradesh and a power transmission project in Karnataka to Alpha Alternatives Fund Advisors.The…
Syndicated from Mercom India · Open original →
More than 90% of the solar capacity being acquired is contracted with the Solar Energy Corp. of India (SECI) under long-term power purchase agreements. The balance is contracted with Karnataka’s distribution companies.
Syndicated from PV Magazine India · Open original →
Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 15 Aug