Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Karnataka is drawing 10,549 MW of electricity at the current hour (2026-06-18T10:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The most recent in-state generation stack for Karnataka is dominated by coal at 63.5% of the metered mix. Grid carbon intensity is 829 gCO2/kWh.
Demand for Karnataka is sourced from a live SLDC scrape (metered, no disaggregation needed).
Composed at 2026-06-18T10:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 10:45 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 10:45 IST
Latest peak
14,783 MW
2-yr peak
18,655 MW
2-yr average
—
Most recent: 2026-06-16
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
No daily MAPE rows yet for Karnataka — the nightly writer fills this once the next IST midnight passes.
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No capture-rate rows for Karnataka yet — the nightly writer fills this once the IEX area-clearing prices and SLDC actuals are both present for the previous IST day.
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 11:30 IST
Reliability — POSOCO PSP
All-time state peak
2026-03-13
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2026-04-25
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange over-drawal +338 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +574 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +381 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -332 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +336 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +509 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -428 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +466 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +460 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +313 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +359 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +324 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Daily analytics cache
30D avg peak
2026-06-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
25.3 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
128 MW mapped
Fiber routes
304 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Karnataka yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Slab | ₹/kWh |
|---|---|
| 0+ kWh | ₹5.80 |
| 100+ kWh | ₹7.00 |
10-Year Tariff History
Residential · 2 orders
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
Exide Industries is moving closer to commercialising India's first large-scale lithium-ion cell manufacturing facility, with the company set to begin customer validation of its Lithium NMC (Nickel Manganese Cobalt Oxide) cylindrical cells ahead of its LFP prismatic battery line…
Syndicated from Saur Energy International · Open original →

The Karnataka Electricity Regulatory Commission (KERC) has proposed reducing levelized generic tariffs for distributed and ground-mounted solar projects serving domestic and non-domestic consumers.It proposed a levelized tariff of ₹2.65 (~$0.028)/kWh for megawatt-scale…
Syndicated from Mercom India · Open original →
India’s wind energy sector received a fresh boost on June 16 after Union Minister for New and Renewable Energy Pralhad Joshi called for a nationwide assessment of ageing wind turbines that could be repowered with modern, higher-capacity machines. The development lifted investor…
Syndicated from Saur Energy International · Open original →

The opportunity: Hitachi Energy is a world leader that is advancing a sustainable energy future for all. We are advancing the world’s energy system to be more sustainable, flexible, and secure, and we collaborate with customers and partners to enable a sustainable energy future…
Syndicated from Saur Energy International · Open original →

The Karnataka Electricity Regulatory Commission (KERC) has issued draft regulations to govern the connectivity and general network access for intrastate transmission and distribution systems.
Syndicated from Mercom India · Open original →
The Karnataka Electricity Regulatory Commission (KERC) has released draft regulations proposing a comprehensive Connectivity and General Network Access (GNA) framework for the state's transmission and distribution network, introducing dedicated provisions for renewable energy…
Syndicated from Saur Energy International · Open original →

Renewable energy industry associations have filed a writ petition before the Karnataka High Court to set aside the Ministry of New and Renewable Energy’s (MNRE) mandate requiring solar cells to be sourced from the Approved List of Models and Manufacturers List-II (ALMM-II) from…
Syndicated from Mercom India · Open original →
The Solar Energy Corporation of India (SECI) reported a 17.4% year-on-year increase in consolidated profit after tax (PAT) to Rs. 721.75 crore in FY 2025-26, compared with Rs. 614.70 crore in the previous fiscal. Its revenue from operations increased to Rs. 18,446.80 crore in…
Syndicated from Saur Energy International · Open original →

The National Institute of Solar Energy (NISE) has identified more than 102 GWp of floating solar potential across India, highlighting a significant opportunity to expand renewable energy deployment on the country's water bodies. The latest report was released by Union Minister…
Syndicated from Saur Energy International · Open original →

The implementation of the Approved List of Models and Manufacturers (ALMM) List-II for solar cells from June 1, 2026, has landed before the Karnataka High Court, with multiple renewable energy industry associations challenging the Ministry of New and Renewable Energy's (MNRE)…
Syndicated from Saur Energy International · Open original →

Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 17 Jun