BSES Yamuna Power Limited
ImprovingAT&C losses, FY16 → FY23
9.2%
Latest
Delhi is drawing 2,887 MW of electricity at the current hour (2026-08-18T01:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Delhi is dominated by Imports at 97.6%. Grid carbon intensity is 596 gCO2/kWh.
Demand for Delhi is sourced from a live SLDC scrape (metered, no disaggregation needed).
The day-ahead hourly demand forecast for Delhi publishes a ±1.5σ band over the next 24 hours — based on 30 similar days across 2 years; level-calibrated x0.86 vs canonical trailing 24h.
Composed at 2026-08-18T01:00:00+05:30
Latest peak
6,881 MW
2-yr peak
8,603 MW
Most recent: 2026-08-14
Weather sensitivity
Weather correlation data is not available for this state yet.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
No MAPE history payload returned for Delhi.
measured but not on the IEA-1763 verified-<5% list — no green badge until the leak-free spike verifies this state on normal days.
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
Reliability — POSOCO PSP
All-time state peak
2026-06-29
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2025-01-23
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange under-drawal -713 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -304 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -302 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +309 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -237 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -233 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -225 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -284 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +280 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange over-drawal +227 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -247 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -257 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Daily analytics cache
30D avg peak
2026-08-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
0.4 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
9 MW mapped
Fiber routes
35 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Delhi yet — it appears once the underlying tariff data is available.
Residential Tariff
DERC (Delhi Electricity Regulatory Commission) · 4 DISCOMs
| Slab | Energy rate (₹/kWh) |
|---|---|
| 0–200 kWh | ₹3.00 |
| 200–400 kWh | ₹4.50 |
| 400–800 kWh | ₹6.50 |
| 800–1200 kWh | ₹7.00 |
| 1200+ kWh | ₹8.00 |
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
BSES Yamuna Power Limited
ImprovingAT&C losses, FY16 → FY23
9.2%
Latest
BSES Rajdhani Power Limited
ImprovingAT&C losses, FY16 → FY23
7.5%
Latest
Tata Power Delhi Distribution Limited
ImprovingAT&C losses, FY16 → FY23
6.0%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 15 Aug