Southern Power Distribution Company of Andhra Pradesh Limited
ImprovingAT&C losses, FY16 → FY23
11.4%
Latest
Andhra Pradesh is drawing 10,734 MW of electricity at the current hour (2026-06-18T10:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The most recent in-state generation stack for Andhra Pradesh is dominated by coal at 67.7% of the metered mix. Grid carbon intensity is 950 gCO2/kWh.
Demand for Andhra Pradesh is sourced from a live SLDC scrape (metered, no disaggregation needed).
Composed at 2026-06-18T10:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 10:07 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 10:07 IST
Latest peak
12,573 MW
2-yr peak
15,016 MW
2-yr average
—
Most recent: 2026-06-16
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
Multi-Year Demand (ICED)
Year-over-year demand profile (national reference series until per-state iced ingest lands).
iced_yearly_demand_profile · 100%2017
140,545 MW
2017
143,474 MW
2017
141,275 MW
2017
142,369 MW
2017
142,575 MW
2017
140,849 MW
2017
139,063 MW
2017
139,045 MW
2017
135,849 MW
2017
139,128 MW
2017
134,410 MW
2017
140,415 MW
No daily MAPE rows yet for Andhra Pradesh — the nightly writer fills this once the next IST midnight passes.
A carbon scorecard isn't published for Andhra Pradesh yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No capture-rate rows for Andhra Pradesh yet — the nightly writer fills this once the IEX area-clearing prices and SLDC actuals are both present for the previous IST day.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 11:00 IST
Reliability — POSOCO PSP
All-time state peak
2026-05-21
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
No shortage in window
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
New all-time peak: 15016 MW (previous 14358 MW)
Grid-India PSP (daily) · POSOCO PSP daily
New all-time peak: 14358 MW (previous 14262 MW)
Grid-India PSP (daily) · POSOCO PSP daily
An hourly residential cost curve isn't published for Andhra Pradesh yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Slab | ₹/kWh |
|---|---|
| 0–30 kWh | ₹1.90 |
| 31–75 kWh | ₹3.00 |
| 76–125 kWh | ₹4.50 |
| 126–225 kWh | ₹6.00 |
| 226–400 kWh | ₹8.75 |
| 400+ kWh | ₹9.75 |
10-Year Tariff History
Residential · 1 order
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Southern Power Distribution Company of Andhra Pradesh Limited
ImprovingAT&C losses, FY16 → FY23
11.4%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
The Andhra Pradesh Electricity Regulatory Commission (APERC) has clarified that connectivity granted under the intrastate transmission system (InSTS) is project-specific and cannot be treated as a freely transferable right.
Syndicated from Mercom India · Open original →
Andhra Pradesh's plan to establish a dedicated agriculture power utility to procure low-cost solar energy through interstate transmission corridors has sparked a debate over the future of power distribution, renewable energy procurement and subsidy management in the state. The…
Syndicated from Saur Energy International · Open original →

NTPC Renewable Energy (NTPC REL) has invited bids for the land and power evacuation package to develop 500 MW of interstate transmission system (ISTS)-connected solar projects in Ananthapuram, Andhra Pradesh.
Syndicated from Mercom India · Open original →
PFC Consulting has announced the winner of the auction to set up an interstate transmission system (ISTS) to evacuate 3 GW of renewable energy from the Kurnool IV Renewable Energy Zone Phase II in Andhra Pradesh.
Syndicated from Mercom India · Open original →
PFC Consulting has announced the winner of its auction to establish an interstate transmission system (ISTS) to evacuate renewable energy for 3 GW of green hydrogen/ammonia projects in Kakinada, Andhra Pradesh. Power Grid Corporation of India (POWERGRID) has been declared the…
Syndicated from Mercom India · Open original →
ReNew Energy Global is entering FY27 with an unusual level of confidence for a renewable energy developer operating in a market increasingly grappling with supply-chain constraints, transmission bottlenecks and financing challenges. The Nasdaq-listed clean energy company…
Syndicated from Saur Energy International · Open original →

The Solar Energy Corporation of India (SECI) reported a 17.4% year-on-year increase in consolidated profit after tax (PAT) to Rs. 721.75 crore in FY 2025-26, compared with Rs. 614.70 crore in the previous fiscal. Its revenue from operations increased to Rs. 18,446.80 crore in…
Syndicated from Saur Energy International · Open original →

Listen to this article The Andhra Pradesh Electricity Regulatory Commission (APERC) has made No Dues Certificates mandatory for the Andhra Pradesh State Load Despatch Centre
Syndicated from Mercom India · Open original →
Quality Power Electrical Equipments Ltd. has signed a term sheet to acquire 100% of Winwin Speciality Insulators Limited (WSIL), a manufacturer of high-voltage ceramic and polymeric insulators based in Visakhapatnam, Andhra Pradesh. The proposed transaction has an enterprise…
Syndicated from Saur Energy International · Open original →

The Andhra Pradesh Electricity Regulatory Commission (APERC) has made it mandatory for consumers and generators seeking short-term open access (STOA) to obtain a No-Dues Certificate (NDC) from the concerned distribution licensee, a move aimed at protecting discoms from mounting…
Syndicated from Saur Energy International · Open original →

Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 17 Jun