BSES Yamuna Power Limited
ImprovingAT&C losses, FY16 → FY23
9.2%
Latest
Delhi is drawing 6,198 MW of electricity at the current hour (2026-06-18T10:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The most recent in-state generation stack for Delhi is dominated by imports at 71.6% of the metered mix. Grid carbon intensity is 481 gCO2/kWh.
Demand for Delhi is sourced from a live SLDC scrape (metered, no disaggregation needed).
Composed at 2026-06-18T10:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 10:07 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 10:07 IST
Latest peak
6,057 MW
2-yr peak
8,568 MW
2-yr average
—
Most recent: 2026-06-16
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
Multi-Year Demand (ICED)
Year-over-year demand profile (national reference series until per-state iced ingest lands).
iced_yearly_demand_profile · 100%2017
140,545 MW
2017
143,474 MW
2017
141,275 MW
2017
142,369 MW
2017
142,575 MW
2017
140,849 MW
2017
139,063 MW
2017
139,045 MW
2017
135,849 MW
2017
139,128 MW
2017
134,410 MW
2017
140,415 MW
No daily MAPE rows yet for Delhi — the nightly writer fills this once the next IST midnight passes.
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No capture-rate rows for Delhi yet — the nightly writer fills this once the IEX area-clearing prices and SLDC actuals are both present for the previous IST day.
Reliability — POSOCO PSP
All-time state peak
2024-06-18
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2025-01-23
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange under-drawal -383 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -312 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -318 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -473 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -419 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -380 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -305 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -336 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -350 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -672 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -381 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -869 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Daily analytics cache
30D avg peak
2026-06-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
0.4 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
9 MW mapped
Fiber routes
35 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Delhi yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Slab | ₹/kWh |
|---|---|
| 0–200 kWh | ₹3.00 |
| 201–400 kWh | ₹4.50 |
| 401–800 kWh | ₹6.50 |
| 801–1200 kWh | ₹7.00 |
| 1200+ kWh | ₹8.00 |
10-Year Tariff History
Residential · 1 order
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
BSES Yamuna Power Limited
ImprovingAT&C losses, FY16 → FY23
9.2%
Latest
BSES Rajdhani Power Limited
ImprovingAT&C losses, FY16 → FY23
7.5%
Latest
Tata Power Delhi Distribution Limited
ImprovingAT&C losses, FY16 → FY23
6.0%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
Ashok Leyland and its electric mobility arm Switch Mobility have signed the first Memorandum of Understanding (MoU) with the Ministry of Road Transport and Highways (MoRTH) under the Government of India's vehicle replacement scheme for the Delhi-NCR region, marking a key step…
Syndicated from Saur Energy International · Open original →

Scheduled for June 16 in New Delhi, the fourth edition of the forum will convene over 250 senior stakeholders to examine how India can scale net-zero action while balancing economic growth, energy security and industrial competitiveness.
Syndicated from ET Energy World · Open original →
Syndicated from Power Line Magazine · Open original →
India's leading renewable energy consumers are increasingly prioritising reliable clean energy supply over merely procuring renewable capacity, as data centres and manufacturers pursue aggressive decarbonisation goals while seeking protection against rising power costs,…
Syndicated from Saur Energy International · Open original →

The Delhi Electricity Regulatory Commission (DERC) has allowed distribution companies in the national capital to recover fuel and power purchase adjustment surcharges (FPPAS) above the 10% ceiling for April 2026.
Syndicated from Mercom India · Open original →
Gujarat-based renewable energy company, Prozeal Green Energy has received a Notification of Award (NOA) from Oil and Natural Gas Corporation Limited (ONGC), for developing a 250 MW (±2%) of captive, ISTS-connected wind power projects. It won the latest order from India's…
Syndicated from Saur Energy International · Open original →

Last week in New Delhi, Union Petroleum and Natural Gas Minister Hardeep Singh Puri held discussions with Venezuela’s acting President Delcy Rodríguez, signalling diversification plans for oil and gas sourcing.
Syndicated from ET Energy World · Open original →
Mercom India’s sixth edition of its flagship event, the Mercom India Renewables Summit, will be held on July 1 and 2, 2026, at the Hyatt Regency in New Delhi.
Syndicated from Mercom India · Open original →
India is set to become Green SM's fifth international market, after Vietnam, Laos, Indonesia, and the Philippines. The company entered India with the launch of Green SM Limo in New Delhi, marking its expansion into another major mobility market. This latest announcement builds…
Syndicated from Saur Energy International · Open original →

The latest hike comes three months after a ₹60-per-cylinder increase announced on March 7, when tensions in West Asia disrupted global energy supplies and pushed up international fuel prices.
Syndicated from ET Energy World · Open original →
Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 17 Jun