Demand — actual & forecast
issued 2 Oct, 23:00 IST
Gujarat is drawing 21,569 MW of electricity at the current hour (2026-10-03T01:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Gujarat is dominated by Coal at 62.8%. Grid carbon intensity is 695 gCO2/kWh.
Demand for Gujarat is sourced from a live SLDC scrape (metered, no disaggregation needed).
The day-ahead hourly demand forecast for Gujarat publishes a ±1.5σ band over the next 24 hours — per-state model v20 (holdout MAPE 5.0%); level-calibrated x1.88 vs canonical trailing 24h.
Composed at 2026-10-03T01:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 04:30 IST
Weather sensitivity
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
Verified <5% on the leak-free IEA-1763 spike; the live-served forecast is currently above target (serving-side level/staleness artifact) pending the recommended calibration deploy.
Median gCO₂/kWh · day-of-week × hour-of-day (IST)
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 02:30 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 02:30 IST
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
Interchange under-drawal -679 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -975 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -825 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -667 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -733 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -1000 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -908 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -942 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -1204 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -442 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -392 MW vs schedule
Inter-state transfer · POSOCO PSP daily
Interchange under-drawal -638 MW vs schedule
Inter-state transfer · POSOCO PSP daily
An hourly residential cost curve isn't published for Gujarat yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Schedule | Slab | Energy rate (₹/kWh) |
|---|---|---|
| RGP | 0–50 kWh | ₹3.05 |
| RGP-BPL | 0–50 kWh | ₹1.50 |
| RGP-PREPAID | 0–50 kWh | ₹2.96 |
| RGP-RURAL | 0–50 kWh | ₹2.65 |
| RGP-RURAL-PREPAID | 0–50 kWh | ₹2.57 |
| RGP | 50–100 kWh | ₹3.50 |
| RGP-RURAL-PREPAID | 50–100 kWh | ₹3.01 |
| RGP-RURAL | 50–100 kWh | ₹3.10 |
12 additional slabs hidden.
10-Year Tariff History
Published slab rates · no derived averages
DISCOM Health
Uttar Gujarat Vij Company Limited
ImprovingAT&C losses, FY20 → FY23
12.1%
Latest
Dakshin Gujarat Vij Company Limited
ImprovingAT&C losses, FY16 → FY23
6.4%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.