Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Karnataka is drawing 12,037 MW of electricity at the current hour (2026-08-18T02:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Karnataka is dominated by Coal at 57.5%. Grid carbon intensity is 551 gCO2/kWh.
Demand for Karnataka is sourced from a live SLDC scrape (metered, no disaggregation needed).
The day-ahead hourly demand forecast for Karnataka publishes a ±1.5σ band over the next 24 hours — based on 30 similar days across 3 years; level-calibrated x1.35 vs canonical trailing 24h.
Composed at 2026-08-18T02:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 17:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 17:45 IST
Latest peak
15,874 MW
2-yr peak
18,655 MW
Most recent: 2026-08-14
Weather sensitivity
Weather correlation data is not available for this state yet.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
No MAPE history payload returned for Karnataka.
No forecast scorecard returned for Karnataka.
| 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mon | ||||||||||||||||||||||||
| Tue | ||||||||||||||||||||||||
| Wed | ||||||||||||||||||||||||
| Thu | ||||||||||||||||||||||||
| Fri | ||||||||||||||||||||||||
| Sat | ||||||||||||||||||||||||
| Sun |
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No solar capture-rate payload returned for Karnataka.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 02:30 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 02:30 IST
Reliability — POSOCO PSP
All-time state peak
2026-03-13
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2026-04-25
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Daily analytics cache
30D avg peak
2026-08-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
21.4 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
128 MW mapped
Fiber routes
304 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Karnataka yet — it appears once the underlying tariff data is available.
Residential Tariff
KERC (Karnataka Electricity Regulatory Commission) · 5 DISCOMs
| Slab | Energy rate (₹/unit) |
|---|---|
| 0+ unit | ₹5.80 |
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Bangalore Electricity Supply Company Limited
ImprovingAT&C losses, FY16 → FY23
13.4%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 15 Aug