Sikkim live electricity demand, fuel mix, and carbon intensity from the India Energy Atlas state-page-live snapshot.
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Sikkim because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
A carbon scorecard isn't published for Sikkim yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
Shortfall
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
We do not show a solar capture-rate for Sikkim because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 11:00 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 10:30 IST
Coverage: frequency since 2025-09-19; congestion since 2026-05-22; demand records since 2018-01-01; news since 2026-05-22.
No congestion or severe events in this window.
Daily analytics cache
30D avg peak
live fallback
YoY peak shift
baseline window
Load factor
0 daily rows
Shortage days
0 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
0 MW mapped
Fiber routes
5 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Sikkim yet — it appears once the underlying tariff data is available.
Upstream: atlas-discom-disaggregation · /v1/discom-disaggregation/hourly-residential-demand
Residential Tariff
| Slab | ₹/kWh |
|---|---|
| 0–50 kWh | ₹1.60 |
| 51–100 kWh | ₹2.60 |
| 101–200 kWh | ₹3.60 |
| 201–400 kWh | ₹4.10 |
| 400+ kWh | ₹4.60 |
10-Year Tariff History
Residential · 1 order
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.