Madhyanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
27.9%
Latest
Uttar Pradesh is drawing 19,546 MW of electricity at the current hour (2026-08-18T02:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The latest modeled in-state generation mix for Uttar Pradesh is dominated by Coal at 96.1%. Grid carbon intensity is 914 gCO2/kWh.
Hourly disaggregation for Uttar Pradesh is awaiting the cross-project Atlas DISCOM Disaggregation tier-A endpoint; once it lands the live page will surface P10/P50/P90 bands without any FE change.
The day-ahead hourly demand forecast for Uttar Pradesh publishes a ±1.5σ band over the next 24 hours — based on 30 similar days across 2 years; level-calibrated x0.50 vs canonical trailing 24h.
Composed at 2026-08-18T02:00:00+05:30
Load shape
SOURCE: SLDC + modeled demand · UPDATED 02:30 IST
Load distribution
SOURCE: SLDC + modeled demand · UPDATED 02:30 IST
Latest peak
30,173 MW
2-yr peak
32,127 MW
Most recent: 2026-08-14
Weather sensitivity
Weather correlation data is not available for this state yet.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
No MAPE history payload returned for Uttar Pradesh.
No forecast scorecard returned for Uttar Pradesh.
A carbon scorecard isn't published for Uttar Pradesh yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No solar capture-rate payload returned for Uttar Pradesh.
Grid cleanliness
Each cell is one hour's grid carbon intensity. Greener = cleaner, browner = more fossil — the green hours are when discretionary load is cheapest on emissions.
SOURCE: CEA carbon factors · UPDATED 02:30 IST
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 02:30 IST
Reliability — POSOCO PSP
All-time state peak
2026-06-24
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
No shortage in window
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
Daily analytics cache
30D avg peak
2026-08-18
YoY peak shift
baseline window
Load factor
2 daily rows
Shortage days
0 MU
30D carbon avg
derived daily layer
Weather-load link
joined weather samples
Data centers
122 MW mapped
Fiber routes
484 route segments
Digital infra basis
State bounds route estimate
Seasonality
Monthly average daily peak load
An hourly residential cost curve isn't published for Uttar Pradesh yet — it appears once the underlying tariff data is available.
Residential Tariff
UPERC · 6 DISCOMs
| Slab | Energy rate (₹/kWh) |
|---|---|
| 0–100 kWh | ₹5.50 |
| 100–150 kWh | ₹5.50 |
| 150–300 kWh | ₹6.00 |
| 300+ kWh | ₹6.50 |
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Madhyanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
27.9%
Latest
Paschimanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
17.9%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
Listen to this article Uttar Pradesh-based renewable energy company Solarworld Energy Solutions has reported a revenue of ₹1.78 billion (~$18.62 million) in the first quarter (Q1)
Syndicated from Mercom India · Open original →
The Uttar Pradesh Electricity Regulatory Commission (UPERC) has dismissed a petition filed by U.P. Rajya Vidyut Utpadan Nigam (UPRVUNL) seeking an enabling regulatory framework for integrating, recognizing, and tariff-treating battery energy storage systems (BESS) with thermal…
Syndicated from Mercom India · Open original →
Alpex Solar reported a mixed financial performance for the first quarter of FY2026-27, with consolidated revenue from operations rising 32.4% year-on-year, while net profit declined 5.7% amid higher finance costs and operating expenses. The company reported consolidated revenue…
Syndicated from Saur Energy International · Open original →

The Uttar Pradesh Electricity Regulatory Commission (UPERC) has dismissed a petition filed by Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) seeking regulatory approvals to install solar power plants within the premises of its generating stations. UPRVUNL had…
Syndicated from Saur Energy International · Open original →

Agastya Green Energy Limited has announced a further ₹7,800 crore expansion into integrated ingot and wafer manufacturing at the Orvakal Industrial Area in Kurnool, Andhra Pradesh — 12 GW each of ingot and wafer capacity, layered on top of the group's existing cell and module…
Syndicated from Saur Energy International · Open original →

Uttar Pradesh Electricity Regulatory Commission (UPERC) has approved 14 power purchase agreements (PPAs) for 31 MW of solar projects under the feeder-level solarization program of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM). The Commission also…
Syndicated from Mercom India · Open original →
The Uttar Pradesh Electricity Regulatory Commission (UPERC) has allowed solar project developers to execute 20.2 MW of projects under Component C-2 of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) program through special purpose vehicles (SPVs).The…
Syndicated from Mercom India · Open original →
Uttar Pradesh is seeking to bring greater clarity to the deployment and grid integration of renewable energy and energy storage projects through the draft Uttar Pradesh Electricity Grid Code (UPEGC) Regulations, 2026. The proposed framework brings renewable energy generating…
Syndicated from Saur Energy International · Open original →

The Industrial Transition Accelerator (ITA), a global multi-stakeholder initiative launched at COP28 to fast-track industrial transition across energy-intensive industries and transport sectors, has now announced the selection of 11 projects that will receive tailored support…
Syndicated from Saur Energy International · Open original →

The Uttar Pradesh Electricity Regulatory Commission (UPERC) has pulled up Uttar Pradesh Power Corporation Limited (UPPCL) and the state’s electricity distribution companies for allegedly violating its directions on recovery of smart meter costs from consumers taking new…
Syndicated from Saur Energy International · Open original →

Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 15 Aug